Sr.No | Division | Subdivision | Office Address | Quotation Description | Last Date | Estimated Amount | Document Link |
1 | Division Mechanical Patiala | sub division no 5 patiala | Sub Divisional Engineer,
Water Supply and Sanitation,
Sub Division. No. 5, Patiala. | Minor electrical repair at various water supply schemes of (Section S-522) Block Bhunerheri and Sanour, Distt. Patiala. | 2025-04-23 16:00:00 | 35000 | Download |
2 | Division Mechanical Patiala | sub division no 5 patiala | Sub Divisional Engineer,
Water Supply and Sanitation,
Sub Division. No. 5, Patiala. | Repair of leakage of pipeline and Sluice valve, Expansion joint, Cleaning of OHSR and other required contingent work to make the schemes functional of various Water Supply Schemes (Section S-522) Block Bhunerheri and Sanour, Distt. Patiala. | 2025-04-23 16:00:00 | 50000 | Download |
3 | Division Mechanical Patiala | sub division no 5 patiala | Sub Divisional Engineer,
Water Supply and Sanitation,
Sub Division. No. 5, Patiala. | Repair of leakage of pipeline and Sluice valve, Expansion joint, Cleaning of OHSR and other required contingent work to make the schemes functional of various Water Supply Schemes (Section S-524) Block Bhunerheri and Sanour, Distt. Patiala. | 2025-04-23 16:00:00 | 50000 | Download |
4 | Division Mechanical Patiala | sub division no 5 patiala | Sub Divisional Engineer,
Water Supply and Sanitation,
Sub Division. No. 5, Patiala. | Minor electrical repair at various water supply schemes of (Section S-524) Block Bhunerheri and Sanour, Distt. Patiala. | 2025-04-23 16:00:00 | 35000 | Download |
5 | Amritsar No 3 | Subdivision No 5 Amritsar | Sub Divisional Engineer Water Supply and Sanitation Sub Division No. 5, Amritsar. | Providing and Making Electrical Connection of AHU and other allied works in Main O.T Block, Guru Nanak Dev Hospital Complex, Amritsar. (Deposit work) | 2025-04-23 14:30:00 | 40000 | Download |
6 | Amritsar No 3 | Subdivision No 5 Amritsar | Sub Divisional Engineer Water Supply and Sanitation Sub Division No. 5, Amritsar. | Repair and Replacement of sanitary fixtures, faucets, accessories and other allied works in the washroom of Dr. Inderjit Singh and Dr. Kashmir Singh of Dialysis unit 3rd floor 200 Bedded Superspeciality block, Guru Nanak Dev Hospital Complex, Amritsar. (Deposit work) | 2025-04-23 14:00:00 | 48500 | Download |
7 | Amritsar No 3 | Subdivision No 5 Amritsar | Sub Divisional Engineer Water Supply and Sanitation Sub Division No. 5, Amritsar. | Replacement of sanitary fixtures, faucets, accessories and other allied works in Junior and Senior Residence room washroom, Dialysis unit 3rd floor 200 Bedded Superspeciality block, Guru Nanak Dev Hospital Complex, Amritsar. (Deposit work) | 2025-04-23 17:58:00 | 47000 | Download |
8 | Moga No. 1 | SUB DIVISION MOGA-1 | Sub Divisional Engineer Water Supply & Sanitation Sub Division - 1 Moga. | 4.Name of Work: A/Mtc/W/S/Scheme DC Regidence Moga, Dist.Moga.
Dismantling of Chinawere Items / Sanitary Fixture.
Cutting of Floor topping of concrete.
Dismantling of wall tile.
Cutting of Chase in wall.
Providing & Fixing CPVC Pipe 20mm.
Providing Garden Spinkler.
Supplying of Flexible Garden Pipe 20mm.
Repair of Leakage G.I / UPVC Pipe.
Any Other Work will be executed at CSR. | 2025-04-25 15:00:00 | 49500 | Download |
9 | Moga No. 1 | SUB DIVISION MOGA-1 | Sub Divisional Engineer Water Supply & Sanitation Sub Division - 1 Moga. | 1.Name of Work: A/Mtc/W/S/Scheme Chota Ghar, Block Moga - 1 Dist.Moga.
Repair & Rewinding of 12.5 BHP Centrifugal Pump & all other work contingent there to complete in all Respect. | 2025-04-23 15:00:00 | 21700 | Download |
10 | SBS Nagar | Sub Division No 1 Balachaur | Office of Executive Engineer W/S & Sanitation Department SBS Nagar. | 1. Excavation manually in trenches for pipe lines with straight or open cutting in streets and lanes in builtup area where width of street / Lane from wall to wall is less than 3 meter including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. Providing & fixing caution boards, watching, fencing, etc. and removal of surplus soil from the site upto 15 meter distance complete in all respects.
2. Providing & fixing C.I/D.I Flanged end, stem of SS (AIS 1410) and Bronze(gunmetal) working parts Sluice Valves ISI marked 14846-2000, including jointing , testing & cost of Nut ,Bolt & insertion sheet, all carriage complete (with the approval of Engineer incharge).
(i). 80mm i/d
(ii). 100mm i/d
(iii). 150mm i/d | 2025-04-30 15:00:00 | 50000 | Download |
11 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Repair of leakage in 3” C.I. pipe line including cost of excavation, dewatering, dismantling, providing and fixing CI D-joint with nut and bolts and other specials, cost of refitting and filling the site after repair complete job in all respects, Repair of leakage in 4” i/d C.I. pipe line with lead jointing including cost of lead, spun yarn etc. & labour charges for hammering and caulking of lead in joints, excavation, dewatering, refilling after the lead jointing complete job in all respects and Repair of 12” Sluice Valve inlet and outlet of filter bed with replacement of CI gland plate, gun metal guide nut, nut & bolt including cost of dismantling, welding, lathe work and refitting Sluice Valve complete job in all respects. | 2025-04-25 12:00:00 | 26000 | Download |
12 | SBS Nagar | Sub Division No 1 Balachaur | Office of Executive Engineer W/S & Sanitation Department SBS Nagar.
| 1. Providing and fixing all work of CSR like Sluice Valves, Sluice Valves Haudi, Cement concrete interlocking, PVC Pipe works etc.
2. Excavation manually in trenches for pipe lines with straight or open cutting in streets and lanes in builtup area where width of street / Lane from wall to wall is less than 3 meter including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. Providing & fixing caution boards, watching, fencing, etc. and removal of surplus soil from the site upto 15 meter distance complete in all respects.
3. Repair of Leakage of PVC/CI/AC Pipe 3",4",6" dia with materials.
4. Bailing out water from the trenches for making new connections in existing pipe lines including cleaning trimming and dressing the trenches to correct alignment and grade as required by the Engineer-in-charge.
5. P/F of CI/PVC D-Joint 3",4",6" including nut bolt and Rubber rings complete in all respect.
6. Dismentaling of various types surfaces(road/pathway).
7. P/F of PVC pipe ISI mark 3",4",6" used in leakage repairs.
8. Repair of Expension Joint/Slucie Valve 3",4",6" as per requirement of site. | 2025-04-30 15:00:00 | 50000 | Download |
13 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Repair of leakage in 12” i/d, 6" i/d and 16" i/d C.I. pipe line with lead jointing including cost of lead, spun yarn etc. & labour charges for hammering and caulking of lead in joints, excavation, dewatering, refilling after the lead jointing complete job in all respects. | 2025-04-25 12:00:00 | 39000 | Download |
14 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Repair of 8” Sluice Valve with replacement of CI gland plate, stainless steel spindle, gun metal guide nut, nut & bolt including cost of dismantling, welding, lathe work and refitting Sluice Valve complete job in all respects and Repair of leakage in 24” i/d C.I. pipe line with lead jointing including cost of lead, spun yarn etc. & labour charges for hammering and caulking of lead in joints, excavation, dewatering, refilling after the lead jointing complete job in all respects. | 2025-04-25 12:00:00 | 35000 | Download |
15 | Barnala | Sub Division No 1 Barnala | ITI Chowk Barnala. | Service and repair of Air conditioners including gas filling and all work related in judges residence complex comp. In all respects.
| 2025-04-28 15:00:00 | 49500 | Download |
16 | SBS Nagar | Sub Division No 1 Balachaur | Office of Executive Engineer W/S & Sanitation Department SBS Nagar.
| 1. Providing and fixing all work of CSR like Sluice Valves, Sluice Valves Haudi, Cement concrete interlocking, PVC Pipe works etc.
2. Excavation manually in trenches for pipe lines with straight or open cutting in streets and lanes in builtup area where width of street / Lane from wall to wall is less than 3 meter including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. Providing & fixing caution boards, watching, fencing, etc. and removal of surplus soil from the site upto 15 meter distance complete in all respects.
3. Repair of Leakage of PVC/CI/AC Pipe 3",4",6" dia with materials.
4. Bailing out water from the trenches for making new connections in existing pipe lines including cleaning trimming and dressing the trenches to correct alignment and grade as required by the Engineer-in-charge.
5. P/F of CI/PVC D-Joint 3",4",6" including nut bolt and Rubber rings complete in all respect.
6. Dismentaling of various types surfaces(road/pathway).
7. P/F of PVC pipe ISI mark 3",4",6" used in leakage repairs.
8. Repair of Expension Joint/Slucie Valve 3",4",6" as per requirement of site. | 2025-04-30 15:00:00 | 50000 | Download |
17 | Barnala | Sub Division No 1 Barnala | ITI Chowk Barnala | Service and repair of Air conditioners including gas filling and all work related in judicial court complex comp. In all respects. | 2025-04-28 15:00:00 | 49500 | Download |
18 | Fatehgarh Sahib | Sub Division No.1 Fatehgarh Sahib | Sub Divisional Engineer,
Water supply and Sanitation Sub Division No 1,
Fatehgarh Sahib | Providing and Fixing of New Battery for Swift Dzire and credit of Old battery. | 2025-04-28 15:30:00 | 16000 | Download |
19 | Fatehgarh Sahib | Sub Division No.1 Fatehgarh Sahib | Sub Divisional Engineer,
water Supply and Sanitation Sub Division No 1,
Fatehgarh Sahib | Service of Govt. Vehicle No PB 23 T 1404 of WSS Division, Fatehgarh Sahib | 2025-04-28 11:00:00 | 15000 | Download |
20 | SBS Nagar | Sub Division No 1 Balachaur | Office of Executive Engineer W/S & Sanitation Department SBS Nagar. | 1. Motor Rewinding charge for 40HP V8 model including less old scrap.
2. Pump Set repair including Gun Metal Impeller sizing, PVC Neck Ring, SS Sleeves, Gun Metal Bush complete V8 model including less old scrap.
3. Adding one stage, replacing driven shaft to meet the required discharge on present head.
4. Up & dwown carriage charge from W/S Scheme Mahipur to Workshop Balachaur.
5. P/F Cable Joints.
6. Supply of PVC insulated PVC sheathed 3Core 16sq.mm. flexible cable with copper conductor (ISI marked) confirm to IS:694/1990.
7. Labour Charge for replacing new cable 16sq.mm. with old one. | 2025-04-28 15:00:00 | 50000 | Download |
21 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | Water Supply & Sanitation Sub Divn. No.1 Sri Anandpur Sahib | Excavation Manually providing fixing of PVC pipes, making mainhole connection construction of new mainhole, disilting dismaintling of pavement, dismantling of CC and other works contigent there too complete in all respect. (Mohalla Fatehgarh) (A/mtc. Sewerage Scheme Sri Anandpur Sahib.(Section GW 066) | 2025-05-02 15:00:00 | 50000 | Download |
22 | Jalandhar No. 2 | Sub Division No 4 | Water Supply & Sanitation Sub Division No.4, Near DC Office, Back Side Puda Complex, New Baradari, Jalandhar | Op/Mtc. at W/S scheme Athoula Block Jalandhar West Distt. Jalandhar | 2025-04-30 11:00:00 | 38000 | Download |
23 | Kapurthala | Sub Division No.2 Kapurthala | Water Supply & Sanitation Sub Division No. 2, Near Phuwara Chowk Kapurthala | Op./Mtc Water Supply Scheme Fattu Chak Block Dhilwan Distt. Kapurthala | 2025-04-25 03:00:00 | 15700 | Download |
24 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Operation of newly installed machinery under AMRUT project by deploying Pump Operator (1 No.) for operation of motors pump installed at booster Sector-70, Mohali and Mali-cum-Chowkidar (1no.) for watch and ward of machinery and booster site for the month of May 2025 | 2025-04-28 15:00:00 | 50000 | Download |
25 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 2 no. Fitter on contract basis (through contractor) at the Minimum wages rates of State of Punjab to run the Machinery of Phase – 4, Kajauli, SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
26 | Fatehgarh Sahib | Sub Division No.1 Fatehgarh Sahib | Sub Divisional Enginee,
Water Supply and Sanitation Sub Division No 1,
Fateharh Sahib | Providing one no Data Entry Operator in Division Office Fatehgarh Sahib | 2025-04-24 14:00:00 | 50000 | Download |
27 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 1 No. Driver Vehicle (jeep) & 1 no.Electrician on contract basis (through contractor) at the Minimum wages rates of State of Punjab to run the Machinery of Phase – 4, Kajauli, SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
28 | Fatehgarh Sahib | Sub Division No.1 Fatehgarh Sahib | Sub Divisional Engineer,
Water Supply and Sanitation Sub Division No 1,
Fatehgarh Sahib | Service and Repair of Air Conditioners in Judicial Court Complex, Fatehgarh Sahib | 2025-04-23 16:29:00 | 49500 | Download |
29 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 3 Nos. Patrolman on contract basis (through contractor) at the Minimum wages rates of State of Punjab to run the Machinery of Phase – 4, Kajauli, SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
30 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 2 Nos. Pump Operator on contract basis (through contractor) at the Minimum wages rates of State of Punjab to run the Machinery of Phase – 4, Kajauli, SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
31 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 2 Nos. Fitter Helper on contract basis (through contractor) at the Minimum wages rates of State of Punjab to run the Machinery of Phase – 4, Kajauli, SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
32 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 3 Nos. Helper on contract basis (through contractor) at the Minimum wages rates of State of Punjab to run the Machinery of Phase – 4, Kajauli, SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
33 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 3 Nos. Helper on contract basis (through contractor) at the Minimum wages rates of State of Punjab to run the Machinery of Phase – 4, Kajauli, SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
34 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 2 no. Pump Operator on contract basis (through contractor) at the Minimum wages rates of State of Punjab to run the Machinery of Phase – 4, Kajauli, SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
35 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 2 Nos. Sub Station Assistant & 1 No. Fitter Helper on contract basis (through contractor) at the Minimum wages rates of State of Punjab to run the Machinery of Phase – 4, Kajauli, SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
36 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 2 No. Bill Distributors on contact basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintinance of Revenue Section SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
37 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as Meter Reader (1 No.) & 1 No. Bill Distributor on contact basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintinance of Revenue Section SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
38 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as Meter Reader (1 No.) & 1 No. Bill Distributor on contact basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintinance of Revenue Section SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
39 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 2 No. Bill Distributor on Contract basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintinance of Revenue Section SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
40 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 2 No. Bill Clerk on Contract basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintinance of Revenue Section SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
41 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 2 Nos. Bill Distributor on contact basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintinance of Revenue Section SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
42 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 1 No. Helper and 1 no. Keyman on Contract basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintenance of Water Supply Scheme Sector 70-71 SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
43 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 3 No. Helper on Contract basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintinance of Water Supply Scheme Sector 70-71 SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
44 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 3 No. Helper on Contract basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintinance of Water Supply Scheme Sector 70-71 SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
45 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 1 No. Pump operator and 1 no. Patrolman on Contract basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintenance of Water Supply Scheme Sector 70-71 SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
46 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 2 Nos. Pump Operator on Contract basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintenance of Water Supply Scheme WTP Sector 57 SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
47 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 1 no. Helper & 1 No. Sweeper & 1 no. MCC on contract basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintenance of Water Supply Scheme WTP Sector 57 SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
48 | Ludhiana No. 1 | Sub Division No. 1 Ludhiana | Water Supply & Sanitation Sub Division No.1,Ludhiana | A/mtc. W/S Scheme Ramgarh, Block Ludhiana-1
Repair of Pipe Line AC/PVC (3”PVC & 6” AC) Leakage including Earthwork in excavation, Bailing out of water, P/F PVC pipe including cutting, jointing, testing , PVC specials, CI D- Joint, etc. complete in all respect and all contingent work there to
A/mtc. W/S Scheme Kohara, Block Ludhiana-1
Repair of Pipe Line AC/PVC (3”PVC, & 6” AC) Leakage including Earthwork in excavation, Bailing out of water, P/F PVC pipe including cutting, jointing, testing , PVC specials, CI D- Joint, etc. complete in all respect and all contingent work there to
| 2025-04-30 15:30:00 | 40000 | Download |
49 | Batala No. 1 | Sub Division No.3 Batala | w/s & sanitation sub division no.3 batala | A/mtc W/S Scheme Mari Panwan Block Shri Hargobindpur :- Repair of 15 BHP Submersible Moter,Pumping Set, Starter Repair, P/F New Auto Cut complete in all respect. | 2025-04-23 14:00:00 | 30000 | Download |
50 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 2 nos. Patrol man and 1 no. MCC on contract basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintenance of Water Supply Scheme WTP Sector 57 SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
51 | Kapurthala | Sub Division No.2 Kapurthala | Water Supply & Sanitation Sub Division No. 2, Near Phuwara Chownk Kapurthala. | Op./Mtc. Water Supply Scheme Nurpur Januha Block Dhilwan Distt. Kapurthala. | 2025-04-24 03:00:00 | 9850 | Download |
52 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 1 Nos. Keyman & 2 nos. Helper on contract basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintenance of Water Supply Scheme WTP Sector 57, SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
53 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 3 nos. Helper on contract basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintenance of Water Supply Scheme WTP Sector 57 SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
54 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| Maintenance of water supply distribution system by deploying labour as 2 No. Pump Operator on contract basis (through contractor) at the Minimum wages rates of State of Punjab for operation and Maintenance of Water Supply Scheme WTP Sector 57 SAS Nagar Mohali including ESIC, EPF, LWF & Contractors Profit for the period of 01.05.2025 to 31.05.2025 | 2025-04-28 15:00:00 | 50000 | Download |
55 | Sangrur | No.2 SANGRUR | sdo2sangrur | Service & repair of Split Air Conditioner & Window Air Conditioner at Court Complex Sangrur/Judge Residence Sangrur | 2025-04-29 12:00:00 | 50000 | Download |
56 | Gurdaspur No. 2 | Sub Division Dinanagar | SUB DIVISIONAL ENGINEER,WATER SUPPLY AND SANITATION SUB DIVISION DINANAGAR | 1. Repair of starter, P/F contactor set complete, Shunt Capictor 4KVR, Overload relay, Timer set , NOC point push button and PVC wire etc.
1 job
per unit rate should be quoted by Agency/Contractor
| 2025-04-23 14:30:00 | 10000 | Download |
57 | Ludhiana No. 3 | Sub Division No. 5 | Water Supply & sanitation, Sub Division No.5, Near Court Complex, Ludhiana. | Repair of C.I pipe 6'including cost of CI D joint rubber ring complete in all respect
Desilting of manhole up to 3 mtr
P/F Brass ball cock wth brass rod 25mm
P/F Brass ball valve 25mm
P/F PVC Cistern 10 ltr cap.
P/F Jet sprey
P/F CP Brass bib cock
P/F Pvc seat cover
P/F PVC Waste pipe
Other work contizent there to
| 2025-04-30 15:00:00 | 47900 | Download |
58 | Garhshanker | SUB DIVISION MAHILPUR | Sub Division Engineer W/S & Sanitation S/D Mahilpur | 1.Name of Work Amtc W/S Scheme Panjura & Baddon
Repair pipeline leakages in AC/PVC 3" 4" & 6" including excavation, Bailing out water, Providing & fixing SV Spindle nut and all other works contingent there too.25000
2.Name of Work Amtc W/S Scheme Jaijon
Repair of leakages in pipeline of different material such as AC/CI/MS/GI and of different diameters by Excavation manually/ mechanically in soil of different strata in Zone B for pipe lines leak repair with straight or open cutting in streets, Welding, Bailing out water, P/F CI D-joint, Repairing the Lead caulked joint with lead and yarn and all other works contingent there too.26000/-
3.Name of Work Amtc W/S Scheme Ajnoha
Repair pipeline leakages in AC/PVC 3" 4" & 6" including excavation, Bailing out water and all other works contingent there too.15000/-
| 2025-04-23 15:00:00 | 66000 | Download |
59 | Garhshanker | Sub Division No.1 Garhshankar | Sub Divisional Engineer W/S & Sanitation S/D No.1. Garhshankar
| Name of work:Amtc. W/S Bora Thana
Repair & Rewinding of 30 BHP submersible pump set including other works contingent.
| 2025-04-23 03:00:00 | 50000 | Download |
60 | Garhshanker | Sub Division No.1 Garhshankar | Sub Divisional Engineer W/S & Sanitation S/D No.1 Garhshankar
| Name of work:Amtc. W/S Scheme Kulewal
Repair & Rewinding of 20 BHP submersible pump set including other works contingent
| 2025-04-23 03:00:00 | 38000 | Download |
61 | Garhshanker | Sub Division No.1 Garhshankar | Sub Divisional Engineer,
W/S & Sanitation Sub Division No.1,
Garhshankar
| A/mtc W/S Scheme
Ghagon Roranwali
tracing out mixing point of dirty water with drinking water at various area in the village Ghagon Roranwal. Repairing of pipe line to stop contamination of water and other works contingent thereto. | 2025-04-23 03:00:00 | 50000 | Download |
62 | Faridkot | Subdivision No 2 Faridkot | Water Supply & Sanitation Sub Division No.2, Faridkot. | A/Mtc. W/S Scheme Dhilwan Khurd.
A/Mtc. W/S Scheme Chak Sahu
Repair of Leakage in distribution system, removing blockage of pipe line of various sizes & all other works contingent there to including cost of material as per PWD specification.
A/Mtc. W/S Scheme Kingra.
A/Mtc. W/S Scheme Machaki Mall Singh
Repair of Clear Water Pump for 20 BHP motor pump set | 2025-05-01 15:00:00 | 44000 | Download |
63 | Garhshanker | Sub Division No.1 Garhshankar | Sub Divisional Engineer,
W/S & Sanitation Sub Division No.1,
Garhshankar
| A/mtc W/S Scheme
Mukandpur ,
Dandewal & Bora
1.Earth work excavation to terrace out pipe to remove leakage/ blockage of
3” ,4” PVC /AC pipe line, pvc pipe & Concrete road with hilty or end cap and any other work contingent there too.
2.P/F spindle nut 6” | 2025-04-23 03:00:00 | 22000 | Download |
64 | Garhshanker | Sub Division No.1 Garhshankar | Sub Divisional Engineer,
W/S & Sanitation Sub Division No.1,
Garhshankar
| Govt.Works
Tehsil/ / Court Complex
Garhshankar.
1. Services of split/window AC 1.5/2 ton complete in all respects at Court Complex Garhshankar & other works contingent there to:
| 2025-04-23 03:00:00 | 50000 | Download |
65 | Khanna | Sub Division Doraha | Water Supply and Sanitation Sub Division Doraha, Backside BDPO Office- Doraha,Distt-Ludhiana
| Repair of pipe line leakages and other repair works of water supply schemes under section S448 Katari Sub Dvision Doraha | 2025-04-30 15:00:00 | 50000 | Download |
66 | Mohali No. 2 | Sub Division No 6 | W/S & Sanitation,
Sub Division No. 6, Phase-5
SAS Nagar
| 1.Repair of 6"i/d sluice valve
2.Repair of leakage in 6"i/d CI pipeline
3.Repair of leakage in 4"i/d CI pipeline | 2025-04-28 15:00:00 | 42800 | Download |
67 | Division Mechanical Patiala | sub division mechanical patiala | Sub Division Mechanical Patiala | Various work at DWSS, Head office Patiala | 2025-04-28 15:00:00 | 44500 | Download |
68 | Rajpura | Sub Division Ghanour | Sub Division Ghanour, Rajpura | Repair and Renovation of Sub Division Ghanour | 2025-04-28 11:55:00 | 49500 | Download |
69 | Hoshiarpur No. 2 | SUB DIVISION GARHDIWALA | SUB DIVISION GARHDIWALA | OP WSS BARI KHAD MAKING BYE PASS AT VILLAGE KORT TO PROVIDE PORTABLE WATER SUPPLY TO VILLAGE KORT AND TAPPA BY WELDING OF MS PIPE LINE 6"/4" ALSO PROVIDIING AND FIXING OF S.V 6" | 2025-04-30 15:00:00 | 49000 | Download |
70 | Khanna | Sub Division No. 1 Khanna | Office of Sub Divisional Engineer, Water Supply and Sanitation Sub Division no.1, Khanna (Water Works Complex Near SDM Office Khanna) | Repair of Submersible motor 20 HP Amtc Water Supply Scheme Bhadla and P/F Sluice valve 150 mm i/d | 2025-04-30 11:00:00 | 27000 | Download |
71 | Hoshiarpur No. 2 | SUB DIVISION NO.3 HOSHIARPUR | W/S and Sanitation Sub Division No. 3, Hsp | Op. WSS Bhungerni
Repair of Submersible Motor Pump set 20 BHP Complete in all respect & all other work contingent their too.
| 2025-04-23 15:00:00 | 30000 | Download |
72 | Mohali No. 2 | Sub Division No 5 | Sub Divisional Engineer
Water Supply & Sanitation, Sub Div No. 5, Phase-1, SAS Nagar
| Repair of 20” M.S. delivery pipe due to leakage on sluice valve 20” with changing 5mm thick rubber packing sheet including dewatering through dewatering set if required at site, labour and hiring cost of gas cutter set, used for cutting old nut bolts and replacing them with new one as per necessity, transportation charges of dewatering set, refitting and testing complete in all respect at W/w phase 1 and 2 kajauli. | 2025-04-30 12:52:00 | 50000 | Download |
73 | Mohali No. 2 | Sub Division No 5 | Sub Divisional Engineer
Water Supply & Sanitation, Sub Div No. 5, Phase-1, SAS Nagar
| Providing and fixing roller bearing No. NU-224 C-3 id SKF make for driving side end of 710 KW Electric Motor of ALSTOM make including dismantling of old/damaged bearing, installing of new bearing, cost of SKF greasing and carriage charges complete job with fitting and testing at Water Works, Kajauli. | 2025-04-30 12:50:00 | 50000 | Download |
74 | Pathankot No. 2 | Sub Division No.-3 Pathankot | room no 236 dc complex | Electrical work at Account office against water supply scheme Baroi Dadwan
Providing & fixing of electrical wiring and other electrical fitting & accessories at Division Account Office complete in all respect
| 2025-04-28 15:30:00 | 13000 | Download |
75 | Mohali No. 3 | SUB DIVISION NO 9 SAS NAGAR | water supply & sanitation sub div no.9 mohali | Section S591 Bariali Repair of pipe line leakage of various sizes, Repair of Sluice Valve, OHSR of cleaning, Repair of expansion joint scouring of pipe line and all other works contigent there to. | 2025-04-30 03:00:00 | 49000 | Download |
76 | Hoshiarpur No. 2 | SUB DIVISION GARHDIWALA | W/S and Sanitation Sub Division Garhdiwala | Op. WSS Manhota
Repair of Sumbersible Motor 15 BHP 15 stage pump 470 feet lowering Complete in all respect & all other work contingent their too.
| 2025-04-23 15:00:00 | 39000 | Download |
77 | Hoshiarpur No. 2 | Sub Division No.4 HOSHIARPUR | Sub Div 4 | Op W/S Scheme Bassi Jamal Khan
repair of leakage/ Blockage in PVC/AC pipe line of various sizes and all other works contingent their too. | 2025-04-25 10:00:00 | 24000 | Download |
78 | Hoshiarpur No. 2 | Sub Division No.4 HOSHIARPUR | Sub div 4 | Op W/S scheme Mal Majara
repair of leakage/ Blockage in PVC/AC pipe line of various sizes and all other works contingent their too. | 2025-04-25 10:00:00 | 25000 | Download |
79 | Hoshiarpur No. 2 | Sub Division No.4 HOSHIARPUR | Sub Div 4 | Op W/S scheme Nangal Shahdeen
repair of leakage/ Blockage in PVC/AC pipe line of various sizes and all other works contingent their too. | 2025-04-24 10:00:00 | 20000 | Download |
80 | Hoshiarpur No. 2 | Sub Division No.4 HOSHIARPUR | Sub Div 4 | Op W/S Scheme Naru Nangal Khas
repair of leakage/ Blockage in PVC/AC pipe line of various sizes and all other works contingent their too. | 2025-04-24 10:00:00 | 30000 | Download |
81 | Hoshiarpur No. 2 | Sub Division No.4 HOSHIARPUR | Sub Div 4 | Op W/S Scheme Dhirowal
repair of leakage/ Blockage in PVC/AC pipe line of various sizes and all other works contingent their too. | 2025-04-26 10:00:00 | 24000 | Download |
82 | Pathankot No. 1 | Sub Division Dunera | WATER SUPPLY & SANITATION SUB DIVISION DUNERA | WATER SUPPLY SCHEME SARTI DUKHNIALI | 2025-04-28 15:00:00 | 32000 | Download |
83 | Hoshiarpur No. 2 | Sub Division No.4 HOSHIARPUR | Sub Div 4 | Op W/S Scheme Bassi Hast Khan
repair of leakage/ Blockage in PVC/AC pipe line of various sizes and all other works contingent their too. | 2025-04-26 10:00:00 | 25000 | Download |
84 | Patiala No. 1 | Sub Division No. 1, Patiala | Water Supply and Sanitation Sub Div. no.1 Pta | 1 P/F cp fixtures, chinaware, water tank, cpvc pipe, sewerage nd all related work at kothi no 37.E , near primary school, model town Patiala
2 Repair and Services of Spilt and Window Type Air Conditioner in Kothi no.1-A (Divisioner Commissoner ) and Circuit house Baradari Garden Patiala.
3 Providing Fixing Wall Tiles floor tiles, Chinaware, CP Fixture, Water Supply, Sewerage and all other Related work at kothi no. 20-E Model town Patiala
4 Providing and Fixing of New 1.5 Ton Cassate type AC and Copper Pipe with insulation and 4 Core Copper Cable and Heavy Duty stand 25mm Drain Pipe PVC, Makong Holes in Brick Wall at all Related work in PPSC Office Patiala.
| 2025-05-02 12:00:00 | 148000 | Download |
85 | Hoshiarpur No. 2 | Sub Division No.4 HOSHIARPUR | sub Div 4 | Op W/s Scheme Kondla
repair of leakage/ Blockage in PVC/AC pipe line of various sizes and all other works contingent their too. | 2025-04-25 10:00:00 | 23000 | Download |
86 | Hoshiarpur No. 2 | Sub Division No.4 HOSHIARPUR | Sub Div 4 | Op W/S Scheme Manan
repair of leakages Blockage PVC/AC pipe line of various sizes and all other works contingent their too. | 2025-04-25 10:00:00 | 26000 | Download |
87 | Pathankot No. 1 | Sub Division Dunera | WATERS SUPPLY & SANITATION SUB DIVISION DUNERA | WATER SUPPLY SCHEME BHANGURI WELL NO.1 | 2025-04-28 15:00:00 | 19000 | Download |
88 | Pathankot No. 1 | Sub Division Dunera | WATER SUPPLY & SANITATION SUB DIVISION DUNERA | WATER SUPPLY SCHEME HARDSOARN | 2025-04-28 15:00:00 | 25000 | Download |
89 | Hoshiarpur No. 2 | Sub Division No.4 HOSHIARPUR | Sub Div 4 | Op W/S Scheme Bassi Kalan, Bajrawar
Earth work excavation in Tranches for repair of leakages of pipe line, including P/F of CI/Pvc D joint 4" and 3" and all other works contingent their too. | 2025-04-23 16:00:00 | 21000 | Download |
90 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of Water Treatment Plant, Phase-6, Mohali by deploying Pump Operator (1 No.) for Operate the motors at water treatment plant at Phase-6, Mohali, Patrolman (1 No.) for patrolling and checking pressure on various points on Rising Main Sector-39, Chandigarh to W.T.P. Phase-6, Mohali for the month of May 2025. | 2025-04-30 15:00:00 | 40000 | Download |
91 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of water supply distribution system by deploying Helper (3 No.) to help fitter to repair minor leakage and repairing of air valve and non-return valve at Phase-1, 2, 3, 4 & 5, Sahibzada Ajit Singh Nagar for May 2025. | 2025-04-30 15:00:00 | 50000 | Download |
92 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of water supply distribution system by deploying Keyman (2 No.) for operating various control valve and scouring various scour points & Patrolman (1 No.) for patrolling and checking pressure on various points on Rising Main Phase-VI to VII and Water Works, Phase-7, Sahibzada Ajit Singh Nagar for May 2025. | 2025-04-30 15:00:00 | 50000 | Download |
93 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of water supply distribution system by deploying fitter helper (3 No.) to help fitter to repair minor leakage and repairing of air valve and non-return valve on Rising Main Phase-VI to VII, Sahibzada Ajit Singh Nagar for May 2025. | 2025-04-30 15:00:00 | 50000 | Download |
94 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of Water Treatment Plant, Phase-6, Mohali by deploying Mali Cum Chowkidar (3 No.) for upkeep of tubewell and watch and ward at Water Works, Phase-6, Mohali for the month of May 2025. | 2025-04-30 15:00:00 | 50000 | Download |
95 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of Water Treatment Plant, Phase-6, Mohali by deploying Helper (3No.) for upkeeping and cleaning the pump house and treatment plant at Phase-6, Mohali for the month of May 2025. | 2025-04-30 15:00:00 | 50000 | Download |
96 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of Water Treatment Plant, Phase-6, Mohali by deploying Helper (3No.) to assist the pump operations in daily operating activities of water treatment plant such as backwashing of filters media regulating the water supply by operating the Sluice Valves, cleaning of water borne structures and repair minor leakages and repairing of non-return valves at Phase-6, Mohali for the month of May 2025. | 2025-04-30 15:00:00 | 50000 | Download |
97 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of water supply distribution system by deploying Helper (1No.) to help fitter to repair minor leakage and repairing of air valve and non-return valve and Data Entry Operator cum Bill Clerk (1 No.) for upkeep of all the records in office at Sub Division at Phase-6, Sahibzada Ajit Singh Nagar for May 2025. | 2025-04-30 15:00:00 | 40000 | Download |
98 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of water supply distribution system by deploying Helper (3 No.) to help fitter to repair minor leakage and repairing of air valve and non-return valve in Phase-10 and 11, Sahibzada Ajit Singh Nagar for May 2025. | 2025-04-30 15:00:00 | 50000 | Download |
99 | Tarn Taran No 2 | SUB DIVISION KHADOOR SAHIB | Sub Division Khadoor Sahib | W/S Scheme Nagoke & Mallah Block Khadoor Sahib Distt. Tarn Taran.
As per Quotation Notice enclosed | 2025-04-23 12:00:00 | 11000 | Download |
100 | Ferozpur No. 1 | Sub Division No.1, Ferozpur | Water Supply and Sanitation Complex, Near Zira Gate Ferozepur | A/mtc of Superintending Engineer, Water Supply and Sanitation Circle, Ferozepur
Repair/Renovation of Old laboratory room and toilet Situated at back side of Circle office building (to be made operational for SBM Staff of District Sanitation Officer, Ferozepur) and all other works contingent thereto.
A/mtc of Superintending Engineer, Water Supply and Sanitation Circle, Ferozepur Residence
Raising of old MS gate and refixing, fixing of angle iron pickest on boundary wall and fixing of barbed wire and all other works contingent thereto.
| 2025-04-25 15:59:00 | 100000 | Download |
101 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of water supply distribution system by deploying Helper (3 No.) to help fitter to repair minor leakage and repairing of air valve and non-return valve in Phase-9 and 10, Sahibzada Ajit Singh Nagar for May 2025. | 2025-04-30 15:00:00 | 50000 | Download |
102 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of water supply distribution system by deploying Mali Cum Chowkidar (3No.) for upkeep of tubewell and watch and ward of water works at Phase-7, 9 and 10, Sahibzada Ajit Singh Nagar for May 2025. | 2025-04-30 15:00:00 | 50000 | Download |
103 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of water supply distribution system by deploying Helper (3 No.) to help fitter to repair minor leakage and repairing of air valve and non-return valve at Phase-9, Sahibzada Ajit Singh Nagar for May 2025. | 2025-04-30 15:00:00 | 50000 | Download |
104 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of water supply distribution system by deploying Mali Cum Chowkidar (3No.) for upkeep of tubewell and watch in Phase-2, 3, 4, 5 and 7, Sahibzada Ajit Singh Nagar for May 2025. | 2025-04-30 15:00:00 | 50000 | Download |
105 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of water supply distribution system by deploying helper (1 No.) to help fitter to repair minor leakage and repairing of air valve and non-return valve for various sites & Pump Operator (1 No.) for Operating various motor pump at Phase-6, Sahibzada Ajit Singh Nagar for the month of May 2025. | 2025-04-30 15:00:00 | 40000 | Download |
106 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of water supply distribution system by deploying helper (3 No.) to help fitter to repair minor leakage and repairing of air valve and non-return valve for various sites of Mohali for the month of May 2025. | 2025-04-30 15:00:00 | 50000 | Download |
107 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali | Maintenance of Water Treatment Plant, Phase-6, Mohali by deploying Pump Operator (1 No.) for operate the motor pump of Tubewell at Phase-1, Mohali. Sweeper Cum Helper (1 No.) and cleaning the pump house and treatment plant, Phase-6, Mohali for the month of May 2025. | 2025-04-30 15:00:00 | 40000 | Download |
108 | Patiala No. 2 | Sub Division No.3 Patiala | Water Supply and Sanitation Division NO 2 Patiala | Supplying of liquid hypo chloride qty 8,500 ltr at Water Supply and Sanitation Division No 2 Patiala including cost of carriage complete in all respect. | 2025-04-28 11:30:00 | 98000 | Download |
109 | Malout | KILLIAN WALI | Water Supply and Sanitation Sub Div Killianwali Near Water Works Dana Mandi Killianwali | Providing the Service of 2 Nos. Unskilled Sewerman for Regular view of Complaint Received from SNK Telephonically, Complaint Register
(For Two Month May ,Jun.)
| 2025-04-29 15:00:00 | 50000 | Download |
110 | Mohali No. 2 | Sub Division No 4 | Phase-6, Mohali. | Deployed 1 No. Consultant to deal with court cases, arbitration cases etc. for the Month of May 2025. | 2025-04-30 15:00:00 | 35000 | Download |
111 | Malout | KILLIAN WALI | water Supply And Sanitation Sub Div Killianwali Near Water Works Dana Mandi Killianwali | Providing the Service of Operator for S.T.P. Bhatti Clonny ( For Three Month May , Jun , July ) | 2025-04-29 15:00:00 | 50000 | Download |
112 | Malout | KILLIAN WALI | Water Supply and Sanitation sub Div Killianwali Near Dana Mandi Water Works | Providing the Service of Operator for Main Pumping Station Malwa Bypass ( For Three Month May , Jun , July ) | 2025-04-29 03:00:00 | 50000 | Download |
113 | Ludhiana No. 3 | Sub Division Jagraon | Shaheed karnail singh gate, near TO jagraon | A/mtc of various w/s scheme Pabbian,Malak, Khosa, lakha, Sujjapur, cheema
Repair of pipeline leakages or Similar work which includes excavation, refilling and restoration of Surface as per CSR, Bailing out water providing and fixing PVC/AC/CI pipe, specials and D joints etc of all sizes as per CSR at site. | 2025-05-05 15:00:00 | 59900 | Download |
114 | Mohali No. 1 | Sub Division No. 2 SAS Nagar | water supply & sanitation SAS Nagar Mohali | Annual Maintence | 2025-04-28 15:00:00 | 50000 | Download |
115 | Mohali No. 1 | Sub Division No. 2 SAS Nagar | water supply & sanitation SAS Nagar Mohali | Annual maintence | 2025-04-28 15:00:00 | 50000 | Download |
116 | Hoshiarpur No. 2 | SUB DIVISION GARHDIWALA | SUB DIVISION GARHDIWALA | OP WSS SCH BHALA MACHIAN OP AND MAINTENANCE OF ABOVE SAID WATER SUPPLY SCHEME INCLUDING WATCH AND WARD AT WATER WORKS AREA ,REPAIR OF PIPE LINE AND ALL OTHER WORKS CONTINGENT THERE TOO. | 2025-04-29 15:00:00 | 18967 | Download |
117 | Khanna | Sub Division Samrala | sub division samrala | Repair of leakages in PVC/AC pipe lines in section – S-452 Bardhalan Scheme Gagra, Salodi,Chak mafi, Manki, Goslan, Sangatpura, at Sub Div Samrala | 2025-04-28 11:00:00 | 48900 | Download |
118 | Khanna | Sub Division Samrala | sub division samrala | Repair of leakages in PVC/AC pipe lines in section – S-451Bagli Kalan, Schemes Dhindsa,Dhilwan, Mandala Khurd, Bomb at Sub Div Samrala | 2025-04-28 11:00:00 | 49700 | Download |
119 | Mohali No. 3 | SUB DIVISION NO 9 SAS NAGAR | Water supply & Sanitation Sub div no.9 mohali | Saneta Colony Topo Graphical Digital survey & survey & epanet design of village | 2025-04-28 03:00:00 | 50000 | Download |
120 | Batala No. 1 | Sub Division No. 2 Batala | near nehru gate batala | Quotations Invited for Annual O&M of Water Supply Scheme massaian, malakpur block batala | 2025-04-25 12:30:00 | 23000 | Download |
121 | Batala No. 1 | Sub Division No. 2 Batala | near nehru gate batala | Quotations Invited for Annual O&M of Water Supply Scheme chandke, bhullar (kala nangal) block batala | 2025-04-25 12:30:00 | 14000 | Download |
122 | Mohali No. 3 | SUB DIVISION DERABASSI | sub division derabassi | Repair of 90mm i/d, 100mm i/d and 160mm i/d size of AC/ PVC pipe line leakages including earth work, excavation, dismantling of brick floor and C.C floor, cutting, jointing, bailing out of water from trenches, providing and fixing of C.I. D-joints of various size with nut bolts and specials, repair, supplying and fixing of Sluice valve of various size, providing PVC pipes various size complete in all respects. | 2025-04-28 15:00:00 | 50000 | Download |
123 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | Water Supply & Sanitation Sub Divn.1 Shri Anandpur Sahib | Revised Total No.6 on Contract basis for Op. & maintenance of Sewerage Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month) | 2025-04-23 15:00:00 | 257448 | Download |
124 | Mohali No. 3 | SUB DIVISION DERABASSI | sub division derabassi | Repair of 90mm i/d, 100mm i/d and 160mm i/d size of AC/ PVC pipe line leakages including earth work, excavation, dismantling of brick floor and C.C floor, cutting, jointing, bailing out of water from trenches, providing and fixing of C.I. D-joints of various size with nut bolts and specials, repair, supplying and fixing of Sluice valve of various size, providing PVC pipes various size complete in all respects. | 2025-04-28 15:00:00 | 50000 | Download |
125 | Mohali No. 3 | SUB DIVISION DERABASSI | sub division derabassi | Repair of 90mm i/d, 100mm i/d and 160mm i/d size of AC/ PVC pipe line leakages including earth work, excavation, dismantling of brick floor and C.C floor, cutting, jointing, bailing out of water from trenches, providing and fixing of C.I. D-joints of various size with nut bolts and specials, repair, supplying and fixing of Sluice valve of various size, providing PVC pipes various size complete in all respects. | 2025-04-28 15:00:00 | 50000 | Download |
126 | Mohali No. 3 | SUB DIVISION DERABASSI | sub division derabassi | Repair of 90mm i/d, 100mm i/d and 160mm i/d size of AC/ PVC pipe line leakages including earth work, excavation, dismantling of brick floor and C.C floor, cutting, jointing, bailing out of water from trenches, providing and fixing of C.I. D-joints of various size with nut bolts and specials, repair, supplying and fixing of Sluice valve of various size, providing PVC pipes various size complete in all respects. | 2025-04-28 15:00:00 | 50000 | Download |
127 | Mohali No. 3 | SUB DIVISION DERABASSI | sub division derabassi | Repair of 90mm i/d, 100mm i/d and 160mm i/d size of AC/ PVC pipe line leakages including earth work, excavation, dismantling of brick floor and C.C floor, cutting, jointing, bailing out of water from trenches, providing and fixing of C.I. D-joints of various size with nut bolts and specials, repair, supplying and fixing of Sluice valve of various size, providing PVC pipes various size complete in all respects. | 2025-04-28 15:00:00 | 50000 | Download |
128 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | Water Supply & Sanitation Sub Divn.1 Shri Anandpur Sahib. | Revised Total No.8 on Contract basis for Op. & maintenance of W/S Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month) | 2025-04-23 15:00:00 | 331332 | Download |
129 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | Water Supply & Sanitation Sub Divn No.1 Sri Anandpur Sahib | Revised Total No.8 on Contract basis for Op. & maintenance of W/S Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month) | 2025-04-23 15:00:00 | 325866 | Download |
130 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | Water Supply & Sanitation Sub Divn. 1 Shri Anandpur Sahib | Revised Total No.8 on Contract basis for Op. & maintenance of W/S Scheme Rampur Lamlehri & W/S/S Dashmesh Academy for the period of 01-05-2025 to 30-06-2025 (2 Month) | 2025-04-23 15:00:00 | 343264 | Download |
131 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No 1,
Sri Anandpur Sahib
| Revised Total No.10 on Contract basis for Op. & maintenance of W/S Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month) | 2025-04-23 15:00:00 | 405148 | Download |
132 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No.1 Sri Anandpur Sahib
| Revised Total 11 No. Employees on Contract basis to maintain the of Sewerage Scheme (STP) Sri Anandpur Sahib for the period of 01-05-2025 to 30-06-2025 (2 Month) | 2025-04-23 15:00:00 | 324712 | Download |
133 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | Revised 11 No. APD/Helper, Bill Clerk on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 572 Amount-458074/- | 2025-04-25 15:00:00 | 458074 | Download |
134 | Hoshiarpur No. 2 | SUB DIVISION NO.3 HOSHIARPUR | water Supply & Santiton Sub Division No.3 Model Town Hoshiarpur. | Op. WSS Bajwara, Chak Sadhu, Jaja, Bassi Wazid
Supply of Ceiling fans at Circle office, Hoshiarpur
Op. WSS Mona Kalan
Repair of 6” Sluice Valve including repair of spindle complete in all respects & all other work contingent their too.
Op. WSS Bathian Brahmana
Repair of 6” Sluice Valve including repair of spindle and repair of 3” AC pipeline complete in all respects & all other work contingent their too.
| 2025-04-28 15:00:00 | 19000 | Download |
135 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | Revised 10 No. APD/Helper,Mcc on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 571 Amount-407436/- | 2025-04-25 15:00:00 | 407436 | Download |
136 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | Revised 09 No. APD/Helper, Ledger Keeper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 570 Amount-377298/- | 2025-04-25 15:00:00 | 377298 | Download |
137 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | Revised 09 No. APD/Helper, Ledger Keeper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 570 Amount-376896/- | 2025-04-25 15:00:00 | 376896 | Download |
138 | Division Mechanical Patiala | sub division mechanical patiala | Sub Division Mechanical Patiala | Various work at DWSS Head office Patiala | 2025-04-25 15:00:00 | 70000 | Download |
139 | Ludhiana No. 3 | Sub Division No. 5 | Water Supply & Saniatation, Sub Division No.5, Near Court Complex Ludhiana. | A/mtc W/S & Sanitation Industrial Estate Ludhiana.
Repair of C.I pipe 6'including cost of CI D joint rubber ring complete in all respect
Providing and fixing in position gully traps 300mmx300mm
Desilting of manhole up to 3 mtr
other work contizent there to
A/mtc W/S & Sanitation Session house Ludhiana.
P/F Stainless steel double bowl sink
Cleaning of water tank 500 ltr cap. Service
Cleaning of water tank 1000 ltr cap.
Service charges of split A.C
| 2025-04-28 15:00:00 | 50000 | Download |
140 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI |
Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi
| Revised 05 No. APD/Helper,Helper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 569 Amount-202574/- | 2025-04-25 15:00:00 | 202574 | Download |
141 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No.1 Sri Anandpur Sahib. | Total 6 No. Employees on Contract Basis Operation and Maintenance of Sewerage Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month) | 2025-04-23 15:00:00 | 257448 | Download |
142 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No.2 Sri Anandpur Sahib. | Total 6 No. Employees on Contract Basis Operation and Maintenance of Sewerage Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month) | 2025-04-23 15:00:00 | 257448 | Download |
143 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI |
Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi
| Revised 09 No. APD/Helper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 569 Amount-376896/- | 2025-04-25 15:00:00 | 376896 | Download |
144 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | Revised 07 No. APD/Helper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 568 Amount-291080/- | 2025-04-25 15:00:00 | 291080 | Download |
145 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | Revised 06 No. APD/Helper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 567 Amount-251264/- | 2025-04-25 15:00:00 | 251264 | Download |
146 | Mohali No. 3 | SUB DIVISION NO 9 SAS NAGAR | water supply & Sanitation sub div no.9 mohali | Repair of pipe line leakage of various sizes, Repair of Sluice Valve, OHSR of cleaning, Repair of expansion joint scouring of pipe line and all other works contigent there to. | 2025-04-28 03:00:00 | 49000 | Download |
147 | Shri Anandpur Sahib | SUB DIVISION NO.2 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No. 2 Sri Anandpur Sahib | Total No.12 Employees on Contract basis for Computer Operator Op. & maintenance of various W/S Scheme Kiratpur/Kalyanpur, Gara Mora, Chikna for the period of 01-05-2025 to 30-06-2025 (2 Month) | 2025-04-23 15:00:00 | 488624 | Download |
148 | Shri Anandpur Sahib | SUB DIVISION NO.2 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No. 2 Sri Anandpur Sahib | Total Number 11 no. of Employees on Contact Basis for Computer Operator And Maintenance of W/S Scheme Agampur, Matour Balowal , Kotla Gajjpur , Mehroli & Khamera for the period of 01-05-2025 To 30-06-2025 (2 Month) | 2025-04-23 15:00:00 | 447688 | Download |
149 | Hoshiarpur No. 2 | Sub Division No.4 HOSHIARPUR | Sub Div 4 Hoshiarpur | Op. & Mtc. of W/S Sch. Including watch & ward of water works area & other works contingent there to.
Op: W/S Sch. Bassi Jamal Khan
Op. & Mtc. of W/S Sch Manguwal Nari
Providing data Entry operator Typing, office against Bassi Mustfa, Bajwara, Chohal at Sub Div.3 Hoshiarpur.
-do- Nara, Bajrawar Driver at Div. No.2
| 2025-04-30 15:00:00 | 80000 | Download |
150 | Fazilka | Sub Division No. 2 Fazilka | W/S And Sanitaion Sub Division No 2 Fazilka, Village Panchan Wali | Refilling of ABC, CO2 and Water type Fire Extinguishers at C block of District Administration Complex, including inspection, testing and refilling as per prescribed safety standards | 2025-04-28 10:37:00 | 46000 | Download |
151 | Fazilka | Sub Division No. 2 Fazilka | W/S & Sanitation Sub Division No 2 Fazilka, Vill Panchan Wali | Comprehensive servicing and repair of the AC unit at ADR block of Judical Court Complex, Fazilka. Including cleaning, gas top-up and replacement of faulty parts to ensure smooth operation. | 2025-04-28 10:35:00 | 38000 | Download |
152 | SBS Nagar | Sub Division No 2 Nawanshahr | Village Saloh near water works salon Nawanshahr | Dhahan Repair of 3", 4" and 6" size of Ac/PVC pipeline leakage including earthwork excavation, dismantling of brick floor and C.C floor cutting, jointing of pipeline with specials at various scheme block nawanshahr distt SBS NAGAR | 2025-04-23 11:00:00 | 50000 | Download |
153 | Mohali No. 3 | SUB DIVISION NO 9 SAS NAGAR | water supply & sanitation sub div no.9 mohali | Repair of pipe line leakage of various sizes, Repair of Sluice Valve, OHSR of cleaning, Repair of expansion joint scouring of pipe line and all other works contigent there to. | 2025-04-24 03:00:00 | 49000 | Download |
154 | Ferozpur No. 1 | Sub Division No.1, Ferozpur | Near Zira Gate Water Supply Sanitation Complex FZR | Tender Notice of 2 No. Various Works Vide no. 690-699 dt 17.04.2025 | 2025-04-30 15:00:00 | 100000 | Download |
155 | Mansa No. 1 | Sub Division Mansa | Sub Division Engineer, Water supply and Sanitation Sub Division Mansa at Jawharke | A/mtc various water supply scheme mansa | 2025-04-28 11:00:00 | 230000 | Download |
156 | Rajpura | Sub Division Banur at Rajpura | Water Supply & Sanitation Sub Division Banur at Rajpura , 1st Floor, Room no.204 Mini Secretariat Rajpura. | ਜਲ ਸਪਲਾਈ ਅਤੇ ਸੈਨੀਟੇਸ਼ਨ ਉਪ ਮੰਡਲ ਬਨੂੜ ਐਟ ਰਾਜਪੁਰਾ ਅਧੀਨ ਆਉਦੇ ਸੈਕਸ਼ਨ S-530 ਦੀਆਂ ਵੱਖ-ਵੱਖ ਜਲ ਸਪਲਾਈ ਸਕੀਮਾਂ ਤੇ ਲੀਕੇਜਾਂ ਆਦਿ ਦਾ ਕੰਮ ਕਰਵਾਉਣ ਸਬੰਧੀ। | 2025-04-23 13:00:00 | 50000 | Download |
157 | Batala No. 2 | SUB DIVISION NO.4 BATALA | Sub Division Engineer, Water Supply and Sanitation Sub Div. No.4 Batala Dharampura Colony near Qadian Chungi Batala | Name of work :- Digital Topographical Survey for village Nijjarpura of block Dera Baba Nanak.
1. Digital survey for providing water supply scheme/ village Nijjarpura providing with 06 nos. color drawing, 01 tracing plan and house hold detail and in form of hard and soft copy in form of email.
2. Hydraulic Design of water supply networkwith epanet software and providing design statement in soft and hard copy.
3. Providing extra color drawings at A0 size.
| 2025-04-24 15:00:00 | 49900 | Download |
158 | Talwara | SUB DIVISION NO. 1 TALWARA | Xen W/S & Sanitation Division Talwara | 1) Op.W/S Scheme Beh Jogan (Karari)
Providing Labour for laying of 150 mm i/d MS Pipe including cost of welding. P/F saluice valve of PN1.6 150 mm i/d & all other works contingent there too. As per Site @Rs.30,000/-
2) Op.W/S Scheme Jugial Sunehra (Ghagwal)
Making by pass by connecting 6” distribution main with 3” MS Pipe By Providing 3” MS Pipe including cost of welding gen set labour and P/F Sluice valve of 150 mm i/d and 80 mmi/d and all other works contingent there too. As per Site @Rs.49500/-
3) Op.W/S Scheme Beh Lakhan
Making by pass by connecting 100mm i/d distribution main with 40mm i/d GI Pipe By Providing 40mm gate valve including cost of welding gen set labour and all other works contingent there too. As per Site @Rs.35000/-
| 2025-04-24 15:00:00 | 114500 | Download |
159 | Bathinda No. 3 | Subdivision No 2 Bathinda | Water supply & sanitation Sub Division No.2 Bathinda | Name of Scheme:- A/Mtc Head water works Bathinda
Supplying & Fixing of Wall Fan of Crompton Make complete in all respect and all other contingent work therto.
Name of Scheme A/Mtc. Govt Residential Building ADC Kothi (D-8)
Repair & Renovation of existing Washroom in ADC Kothi D-8 and all other works contingent thereto.
Name of Scheme A/Mtc. Govt SSP Vigilance Residential Building
Repair & Renovation of Washroom at SSP Vigilance and all other works contingent thereto.
Name of Scheme:- A/Mtc Head Water Works Bathinda
Providing & Fixing of New Sluice Value Various sizes & repair of Sluice Value various size , Making connection, charge line & all other work contingent thereto.
Name of Scheme:- A/Mtc. Govt. Residential Building Bathinda
Providing & Fixing New Submersible Motor 1HP of B&R, Kothi No R-1 & all other works contingent thereto.
Name of Scheme:- A/Mtc Head water works Bathinda
Repair of RO In sub Division Office & Installing Water cooler motor complete in all respect and all other contingent work therto.
Name of Scheme:- A/Mtc. Govt. Residential Building Bathinda
Providing & Fixing New 1000 Ltr. HDPE Water tank at DC Residence Staff quarter in place of old damage tank & all other works contingent thereto.
| 2025-05-02 11:00:00 | 227000 | Download |
160 | Mukatsar No 2 | Subdivision No 4 Mukatsar | Main Water Works Complex KKP Road Sri Muktsar Sahib | 1)Providing & Laying PVC Pipe Line 90 mm o/d at Bhai Jarnail Singh Nagar Byepass
2) Repair of 150 BHP Pump Fitted at Pump Chamber No 3 Main Water Works | 2025-04-23 15:00:00 | 92000 | Download |
161 | Mohali No. 1 | Sub Division No. 1 Chandigarh | Water Supply & Sanitation Division No. 1,at Chandigarh. | ਇਸ ਮੰਡਲ ਦਫਤਰ ਅਧੀਨ ਆਉਂਦੇ ਉਪ ਮੰਡਲ ਨੰ: 1, ਐਂਟ ਚੰਡੀਗੜ੍ਹ ਦੇ ਅਧੀਨ ਆਉਦੇ ਕੰਮ 46 ਨੰ: ਮਾਨਯੋਗ ਮੰਤਰੀ ਅਤੇ ਸੀਨੀਅਰ ਅਫਸਰ ਸਹਿਬਾਨਾਂ ਜੀ ਦੀਆਂ ਰਿਹਾਇਸਾਂ ਸੈਕਟਰ-39-ਡੀ ਚੰਡੀਗੜ੍ਹ, 26 ਨੰ ਐਮਐਲਏ ਫਲੈਟਸ, ਸੈਕਟਰ-39, ਚੰਡੀਗੜ੍ਹ, ਵਿਖੇ ਵਿਭਾਗ ਵਲੋਂ ਲਗਵਾਏ ਬਿਜਲੀ ਦੇ ਉਪਕਰਨਾਂ ਦੀ ਰਿਪੇਅਰ ਅਤੇ ਖਰਾਬ ਹੋਏ ਸਮਾਨ ਦੀ ਥਾਂ ਤੇ ਨਵਾਂ ਸਮਾਨ ਲਗਵਾਉਣਾ ਆਦਿ ਅਤੇ ਪਬਲਿਕ ਹੈਲਥ ਨਾਲ ਸਬੰਧਤ ਕੰਮਾਂ ਨੂੰ ਕਰਵਾਉਣਾ ਆਦਿ। | 2025-04-23 15:00:00 | 500000 | Download |
162 | Mohali No. 1 | Sub Division No. 2, Patiala | Water Supply & Sanitation Division No. 1,at Chandigarh. | ਇਸ ਮੰਡਲ ਦਫਤਰ ਅਧੀਨ ਆਉਂਦੇ ਉਪ ਮੰਡਲ ਨੰ: 1, ਐਂਟ ਚੰਡੀਗੜ੍ਹ ਦੇ ਅਧੀਨ ਆਉਦੇ ਕੰਮ 46 ਨੰ: ਮਾਨਯੋਗ ਮੰਤਰੀ ਅਤੇ ਸੀਨੀਅਰ ਅਫਸਰ ਸਹਿਬਾਨਾਂ ਜੀ ਦੀਆਂ ਰਿਹਾਇਸਾਂ ਸੈਕਟਰ-39-ਡੀ ਚੰਡੀਗੜ੍ਹ, 26 ਨੰ ਐਮਐਲਏ ਫਲੈਟਸ, ਸੈਕਟਰ-39, ਚੰਡੀਗੜ੍ਹ, ਵਿਖੇ ਵਿਭਾਗ ਵਲੋਂ ਲਗਵਾਏ ਬਿਜਲੀ ਦੇ ਉਪਕਰਨਾਂ ਦੀ ਰਿਪੇਅਰ ਅਤੇ ਖਰਾਬ ਹੋਏ ਸਮਾਨ ਦੀ ਥਾਂ ਤੇ ਨਵਾਂ ਸਮਾਨ ਲਗਵਾਉਣਾ ਆਦਿ ਅਤੇ ਪਬਲਿਕ ਹੈਲਥ ਨਾਲ ਸਬੰਧਤ ਕੰਮਾਂ ਨੂੰ ਕਰਵਾਉਣਾ ਆਦਿ। | 2025-04-23 15:00:00 | 500000 | Download |
163 | Ludhiana No. 1 | Sub Division No. 2 Ludhiana | New court Complex, Ludhiana | As Per Enclosement | 2025-04-24 12:00:00 | 49500 | Download |
164 | Ludhiana No. 1 | Sub Division No. 2 Ludhiana | New Court Complex, Ludhiana | As per Enclosement | 2025-04-24 11:00:00 | 49500 | Download |
165 | Ludhiana No. 1 | Sub Division No. 2 Ludhiana | New Court Complex lUDHIANA | As per Enclosement | 2025-04-24 10:00:00 | 49500 | Download |
166 | Faridkot | Subdivision No 1 Faridkot | Sub Divisional Engineer, W/S & Sanitation, Sub Divn. No. 1 Faridkot. | 30 Head wise & JJM Head wise Quatations | 2025-04-28 15:00:00 | 38000 | Download |
167 | Bathinda No. 1 | Sub Division No.1 Bathinda | Room No.424, Water Supply and Sanitation Sub Division No.1, Bathinda. Mini Secretariat Bathinda
| "Providing & Supply of Sodium Hypochlorite
At Water Supply Scheme Burj Mehma, Behman Diwana, Killi Bhisiana, Phus Mandi, Bhagu, Katar Singh Wala, Teona, Jhumba, Kot Shamir & Naruana.
Block & District Bathinda. "
| 2025-04-30 11:00:00 | 49000 | Download |
168 | Bathinda No. 1 | Sub Division No.1 Bathinda | Room No.424, Water Supply and Sanitation Sub Division No.1, Bathinda. Mini Secretariat Bathinda
| "Providing & Supply of Sodium Hypochlorite
At Water Supply Scheme Gill Patti, Goniana Kalan, Ganga, Ablu, Killi Bhisiana & Mehma Sarja
Block Goniana & District Bathinda. "
| 2025-04-30 11:00:00 | 49000 | Download |
169 | Ferozpur No. 1 | Sub Division No.1, Ferozpur | Near Zira Gate Water Supply and Sanitation Complex Ferozepur | Tender notice of 10 No. Various Works vide no.680-689 dt 17.04.2025 | 2025-04-30 15:00:00 | 390000 | Download |
170 | Ludhiana No. 1 | Sub Division No. 1 Ludhiana | water supply & Sanitation Sub Div. No.1 Inside New Court Complex Ludhiana | A/mtc. W/S Scheme Himmayupura, Block Ludhiana-1
Repair of Pipe Line AC/PVC (3”PVC & 6” PVC) Leakage including Earthwork in excavation, Bailing out of water, P/F PVC/AC pipe including cutting, jointing, testing , PVC specials, CI D- Joint, etc. and Repair of Sluice Valve 6” & Repair of Expansion Joint 4” & Repair of control panel complete in all respect and all contingent work there to
A/mtc. W/S Scheme Kheri Jhameri, Block Ludhiana-1
Repair of Pipe Line AC/PVC (3”PVC & 6” PVC) Leakage including Earthwork in excavation, Bailing out of water, P/F PVC/AC pipe including cutting, jointing, testing , PVC specials, CI D- Joint, etc. and Repair of Sluice Valve 6” & Repair of Expansion Joint 4” complete in all respect and all contingent work there to
A/mtc. W/S Scheme Pamal, Block Ludhiana-1
Repair of Pipe Line AC/PVC (3”PVC & 6” PVC) Leakage including Earthwork in excavation, Bailing out of water, P/F PVC/AC pipe including cutting, jointing, testing , PVC specials, CI D- Joint, etc. and Repair of Sluice Valve 6” & Repair of Expansion Joint 6” & complete in all respect and all contingent work there to
| 2025-04-28 15:00:00 | 50000 | Download |
171 | Rajpura | Sub Division Rajpura | Water Supply & Sanitation Sub Division Rajpura, 1st Floor, Room no.201 Mini Secretariat Rajpura. | A/Mtc water supply scheme Mini Secretariat, Rajpura (Govt. Works) | 2025-04-24 13:00:00 | 30000 | Download |
172 | Rajpura | Sub Division Rajpura | Water Supply & Sanitation Sub Division Rajpura, 1st Floor, Room no.201 Mini Secretariat Rajpura. | A/Mtc water supply scheme judicial court complex, Rajpura (Govt. Works) | 2025-04-24 13:00:00 | 30000 | Download |
173 | Rajpura | Sub Division Ghanour | Sub Division Ghanour, Rajpura | A/mtc of Various WS Schemes block ghanour and shambu kalan. | 2025-04-23 11:55:00 | 50000 | Download |
174 | Ludhiana No. 3 | Sub Division Sidhwan Bet | water supply and sanitation, divison no. 3, sub division sidhwanbet at ludhiana |
1.
2.
3.
A/mtc W/S Schemes kotmaan and Bhumal
Repair and removal of leakage from pipe lines, including cost of material ,bailing out water, Excavation in Earthwork etc complete in all respect
Repair of AC/PVC pipe line 3'
Repair of AC/PVC pipe line 4'
Repair of AC/PVC pipe line 6'
A/mtc W/S Schemes Amargarh Kaler and Seikh Dault
Repair and removal of leakage from pipe lines, including cost of material ,bailing out water, Excavation in Earthwork etc complete in all respect
Repair of AC/PVC pipe line 3'
Repair of AC/PVC pipe line 4'
Repair of AC/PVC pipe line 6'
A/mtc W/S Schemes Sidhwan Kalan and Pona
Repair and removal of leakage from pipe lines, including cost of material ,bailing out water, Excavation in Earthwork etc complete in all respect
Repair of AC/PVC pipe line 3'
Repair of AC/PVC pipe line 4'
Repair of AC/PVC pipe line 6'
20000/-
20000/-
20000/-
05-05-2025
3.00 PM
| 2025-05-05 15:00:00 | 60000 | Download |
175 | Fazilka | Sub Division Jalalabad | WSS SUB DIVISION JALALABAD | Repair and service of Air conditioner installed at judicial court complex jalalabad | 2025-04-23 16:00:00 | 50000 | Download |
176 | Fazilka | Sub Division Jalalabad | WSS SUB DIVISION JALALABAD | Repair and service of Air conditioner installed at SDM office jalalabad | 2025-04-23 16:00:00 | 50000 | Download |
177 | Mohali No. 3 | SUB DIVISION NO 7 SAS NAGAR | Phase-2, Mohali | A/Mtc of water supply Naya Gaon
1. Repair of leakages of sizes 3”/4”/6” PVC/AC/CI/GI pipes including excavation, cutting, jointing, bailing out water, P/F of D-joints, Pipes etc and all other works contingent thereto , as per CSR at choti karoran, kumao colony and dashmesh nagar
2 Repair of Sluice Valves along with SS Spindle, GM guide nut, GM neck ring, cost with material dismantling, dewatering and repair at site complete job as per NS rate.
a) 80mm i/d
b) 100mm i/d
c) 150mm i/d
| 2025-04-24 03:00:00 | 49000 | Download |
178 | Fatehgarh Sahib | Sub Division Amloh at Saunti | water supply and sanitation sub division amloh at sounti opposite desh bhagat global school village sounti block amloh Dist. fatehgarh sahib. | servicing, Repair, Gas filling of window, split Ac judicial court complex Amloh. | 2025-04-24 11:14:00 | 49000 | Download |
179 | Zira | Subdivision Zira | Water Supply & Sanitation Sub Division no.1 Zira | Prov. Ny pass copper pipe to existing AC in court room no. 3 & repair of old AC including replacement of new compressor with all other necesory and repair service & Gas filling of other ACs at court complex Zira | 2025-05-02 11:00:00 | 49500 | Download |
180 | Fazilka | Sub Division No. 2 Fazilka | W/s and sanitation sub -division No.2 Fazilka village Pancha wali | Service and Repair of Air Conditioning unit at Frist Floor of JCC fazilka Works include thorough cleaning ,gas charging and replacement of defective parts to restore proper functionality | 2025-04-23 10:53:00 | 40000 | Download |
181 | Fazilka | Sub Division No. 2 Fazilka | W/s and sanitation sub-division no.2 fazilka village pancha wali | Refilling of ABC,CO2 and water type fire Exinguisher at B block of District Administration Complex , includuing through inspection ,pressure testing and replacement of extinguising agents in compliance with safety norm | 2025-04-23 10:34:00 | 47500 | Download |
182 | Fazilka | Sub Division No. 2 Fazilka | W/s and sanitation sub-division no.2 fazilka village Pancha wali | Repair and Service of Air Conditioning unit at the second floor of jcc fazilka including cleaning gas reflling and replacement of manlfunctioning componentsfor optimal performance | 2025-04-23 10:15:00 | 48000 | Download |
183 | Division Mechanical Patiala | sub division mechanical patiala | Sub Division Mechanical Patiala | Providing of unskilled for labour cleaning, sweeping & swabbing of Head office, Patiala | 2025-04-24 15:00:00 | 210000 | Download |
184 | Bathinda No. 2 | Sub Division Talwandi Sabo | Water Supply and Sanitation Sub Division Talwandi Sabo | A/mtc W/S scheme Court Complex & Judiciary Residence (Govt Works) at Talwandi Sabo
Joining of Court Complex Sewer-line to Main Sewer Line, Repair of existing Manhole Chambers & Inspection Chambers , Sewer leakage repair and other works as per site requirements
| 2025-04-23 11:00:00 | 49500 | Download |
185 | Rajpura | Sub Division Banur at Rajpura | Water Supply & Sanitation Sub Division Banur at Rajpura , 1st Floor, Room no.204 Mini Secretariat Rajpura. | ਜਲ ਸਪਲਾਈ ਅਤੇ ਸੈਨੀਟੇਸ਼ਨ ਉਪ ਮੰਡਲ ਬਨੂੜ ਐਟ ਰਾਜਪੁਰਾ ਅਧੀਨ ਆਉਂਦੀਆਂ ਜਲ ਸਪਲਾਈ ਸਕੀਮਾਂ ਵਿਖੇ ਵੱਖ ਵੱਖ ਕੰਮ ਕਰਵਾਉਣ ਸਬੰਧੀ। | 2025-04-23 13:00:00 | 50000 | Download |
186 | Rajpura | Sub Division Bahadurgarh | Water Supply & Sanitation Sub Division, Bahadurgarh. | ਜਲ ਸਪਲਾਈ ਸਕੀਮ ਕਸਬਾ ਰੂੜਕੀ ਟਿਊਬਵੈੱਲ ਨੰ. 2 ਵਿਖੇ ਵੱਖ-ਵੱਖ ਥਾਵਾਂ ਤੋਂ ਪਾਣੀ ਦੀ ਪਾਈਪ ਲਾਈਨ ਦੀ ਬਲੋਕੇਜ ਨੂੰ ਦੂਰ ਕਰਨ ਸਬੰਧੀ। | 2025-04-23 12:00:00 | 45000 | Download |
187 | Rajpura | Sub Division Banur at Rajpura | Water Supply & Sanitation Sub Division Banur at Rajpura , 1st Floor, Room no.204 Mini Secretariat Rajpura. | ਜਲ ਸਪਲਾਈ ਅਤੇ ਸੈਨੀਟੇਸ਼ਨ ਉਪ ਮੰਡਲ ਬਨੂੜ ਐਟ ਰਾਜਪੁਰਾ ਅਧੀਨ ਆਉਂਦੀ ਸਕੀਮ ਬਸੰਤਪੁਰਾ ਵਿਖੇ ਵੱਖ ਵੱਖ ਕੰਮ ਕਰਵਾਉਣ ਸਬੰਧੀ। | 2025-04-23 13:00:00 | 50000 | Download |
188 | Patiala No. 2 | Sub Division No.3 Patiala | O/o SDE WSS Sub Div. No. 3, Patiala | ਦਫ਼ਤਰ ਉਪ ਮੰਡਲ ਇੰਜੀਨੀਅਰ, ਜਸਸ, ਉਪ ਮੰਡਲ ਨੰ: 3, ਪਟਿਆਲਾ ਅਧੀਨ ਪੈਂਦੀਆ ਹੇਠ ਅਨੁਸਾਰ ਵੱਖ-ਵੱਖ ਸਲਾਨਾ ਦੇਖਭਾਲ ਜਲ ਸਪਲਾਈ ਸਕੀਮਾਂ ਨੂੰ ਠੇਕੇ ਤੇ ਚਲਾਉਣਾ ਅਤੇ ਸੰਚਾਲਣ/ਰੱਖ-ਰਖਾਵ ਕਰਨਾ, ਫੁੱਲ ਬੂਟੇ, ਹੈਜ, ਘਾਹ ਆਦਿ ਦੀ ਦੇਖਭਾਲ ਕਰਨਾ, ਪੰਪ ਚੈਂਬਰ, ਮਸ਼ੀਨਰੀ ਅਤੇ ਵਾਟਰ ਵਰਕਸ ਨੂੰ ਸਾਫ਼ ਸੁਥਰਾ ਰੱਖਣਾ, ਲਾਗ ਬੁੱਕ ਮੇਨਟੇਨ ਕਰਨਾ, ਲੋੜ ਅਨੁਸਾਰ ਰੋਗਾਨੂ ਮੁਕਤ ਦਵਾਈ ਟੈਂਕੀ ਵਿੱਚ ਪਾਉਣ, ਗੈਰ-ਕਾਨੂੰਨੀ ਕੁਨੈਕਸ਼ਨਾਂ ਨੂੰ ਕੱਟਣਾ ਅਤੇ ਰੈਗੂਲਰ ਕੁਨੈਕਸ਼ਨਾਂ ਵਿੱਚ ਵਾਧਾ ਕਰਨਾ, ਲੋੜ ਅਨੁਸਾਰ ਵਿਭਾਗ ਨਾਲ ਮੋਬਾਈਲ ਰਾਹੀਂ ਸਮੇਂ-ਸਮੇਂ ਤੇ ਸੰਪਰਕ ਕਰਨਾ, ਖਪਤਕਾਰਾਂ ਨੂੰ ਉਨ੍ਹਾਂ ਦੇ ਪਾਣੀ ਦੇ ਬਿੱਲ ਵੰਡਣੇ ਅਤੇ ਉਨ੍ਹਾਂ ਦਾ ਮੁਕੰਮਲ ਰਿਕਾਰਡ (ਨਾਮ, ਪਿਤਾ ਦਾ ਨਾਂ, ਪਤਾ, ਮੋਬਾਇਲ ਨੰ: ਆਦਿ ਮੇਨਟੇਨ ਕਰਨਾ, ਇੱਕ ਮਹੀਨੇ ਵਿੱਚ ਪਿੰਡ ਵਿੱਚ ਹੋਈਆ 04 ਲੀਕੇਜ਼ਾ ਨੂੰ ਠੀਕ ਕਰਨਾ ਅਤੇ ਵਿਭਾਗ ਵੱਲੋਂ ਸਮੇਂ-ਸਮੇਂ ਤੇ ਜਾਰੀ ਕੀਤੀਆ ਸ਼ਰਤਾ ਅਤੇ ਨਿਯਮਾਂ ਮੁਤਾਬਕ ਕੰਮ ਕਰਨਾ:-
(1) ਨੰਦਪੁਰ ਕੇਸ਼ੋ, (2) ਸ਼ੇਰ ਮਾਜਰਾ, (3) ਚਲੈਲਾ, (4) ਧਨੌਰੀ, (5) ਅਮਾਮ ਨਗਰ, (6) ਢਕੜਬਾ, (7) ਹਰੀ ਨਗਰ ਖੇੜਕੀ,(8) ਰਣਬੀਰਪੁਰਾ, (9) ਸੈਂਸਰਵਾਲ, (10) ਮੈਣ, (11) ਨਵਾਂ ਡਕਾਲਾ, (12) ਬੀਬੀਪੁਰ, (13) ਡਕਾਲਾ, (14) ਦੇਵੀਨਗਰ, (15) ਕਾਠ ਮੱਠੀ, (16) ਸੱਸਾ ਗੁੱਜਰਾਂ, (17) ਰਾਮ ਨਗਰ, (18) ਸੁਲਤਾਨਪੁਰ, (19) ਪਹਾੜਪੁਰ, (20) ਸਵਾਜਪੁਰ ਨਵਾਂ, (21) ਭੇਡਪੁਰਾ, (22) ਕਲਿਆਣ, (23) ਬੀਬੀਪੁਰ-2, (24) ਗੱਜੂ ਮਾਜਰਾ, (25) ਜਾਹਲਾਂ, (26) ਬਠੋਈ ਕਲਾਂ, (27) ਲਲੋਛੀ, (28) ਤਰੋੜਾ ਕਲਾਂ, (29) ਮੱਵੀ ਸੱਪਾ, (30) ਖੇੜੀ ਮੁਸਲਮਾਨੀਆ, (31) ਹਸਨਪੁਰ ਪ੍ਰੋਹਤਾ, (32) ਇਸਹਾਬਪੁਰਾ, (33) ਡਰੋਲੀ, (34) ਕਸਿਆਣਾ, (35) ਫੱਗਣ ਮਾਜਰਾ, (36) ਹਿਰਦਾਪੁਰ
| 2025-04-28 15:00:00 | 50000 | Download |
189 | SBS Nagar | Sub Division No 1 Nawanshahr | OPP SSP Residence Chd Road Nawanshahr. | Name of work: Providing 160mm o/d sewer pipe at Govt,Senior Secondary School,NSR | 2025-04-23 12:00:00 | 50000 | Download |
190 | SBS Nagar | Sub Division No 1 Nawanshahr | OPP SSP Residence Chd Road Nawanshahr | A/m/c W/S Schemes Jagatpur, Block Aur | 2025-04-23 10:00:00 | 16500 | Download |
191 | Rajpura | Sub Division Rajpura | Mini Secretariat Rajpura | Disilting of manhole including all safety measures, cost of container T & P and disposal of silt upto 5km complete in all respects
Depth upto 3 m.
Roding in SWR Upvc pipe for cleaning of blockage
Providing JCB for excavation for finding out manhole/sewerage pipe
Providing, laying in trenches to correct gradient and alignment and jointing of UPVC pipes having ISI specification IS:15328-2003 class-SN-8 marked make Supreme, Finolex, Kissan, Jain, Prince or equivalent good on them and laying the same in trenches to correct alignment and gradients, cutting and jointing, testing for water tightness and making good the leakages and defects including cost of specials (Specials and Solvent should be of same make as that of pipes) complete in all respects.
200mm o/d pipe
Making connection with existing sewer pipe line
Constructing brick masonry manhole incement mortar 1:5 ( 1 cement : 5 coarse sand ) R.C.C. top slab 20cm thick using M-20 mix by using mixer and vibrator, TMT Fe500 @ 80.00 kg/per cum, foundation concrete 1:4:8mix (1 cement: 4 coarse sand : 8 graded stone aggregate 40mm nominal size) inside plastering 12mm thick with cement mortar 1:3 (1 cement: 3 coarse sand) finished with floating coat of neat cement and making 40mm thick benching in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) finished with a floating coat of neat cement, Orange coloured PVC steps including RCC cover with frame complete as per standard design complete in all respects.
Inside size 90x150 cm and 120 cm deep
Extra payable for every 0.30 m additional depth of manhole chamber in item 29.55 upto 1.80 m increase in depth.
Inside size 90x150 cm and 120 cm deep
| 2025-04-23 13:00:00 | 50000 | Download |
192 | SBS Nagar | Sub Division No 1 Nawanshahr | OPP SSP Residence Chd Road Nawanshahr. | A/m/c W/S Scheme New Judicial Court Complex,NSR | 2025-04-25 11:00:00 | 50000 | Download |
193 | Rajpura | Sub Division Rajpura | Mini Secretariat Rajpura | Labour Charges for Dismantling of Old damaged Non Return valve /Sluice valve of various size 4” & 6” & Refixing after repair at various water supply schemes
Repair of NRV/SV of various size 4” & 6” complete in all respect.
Providing and Fixing Rubber Jain
Providing and Fixing Nut Bolt
Providing & Fixing of NRV and Sluice valve of various size 4” & 6” ISI marked & all other contingent work there to at various water supply schemes
| 2025-04-23 15:00:00 | 50000 | Download |
194 | SBS Nagar | Sub Division No 1 Nawanshahr | OPP SSP Residence chd road Nawanshahr. | A/m/c W/S Schemes New Judicial Court Complex,NSR | 2025-04-25 10:00:00 | 50000 | Download |
195 | SBS Nagar | Sub Division No 1 Nawanshahr | OPP SSP Residence Chd Road Nawanshahr | Ch.to W/S Scheme Khurda & Sahlon, Block Aur | 2025-04-23 11:00:00 | 24000 | Download |
196 | Fatehgarh Sahib | Sub Division No.2 Fatehgarh Sahib | Water Supply and Sanitation Sub Division No.2 Fatehgarh Sahib | ਜਲ ਸਪਲਾਈ ਸਕੀਮ ਨਾਨੋਵਾਲ ਸਲੂਸ ਵਾਲਬ 4’’ 1 No
ਜਲ ਸਪਲਾਈ ਸਕੀਮ ਚੜੀ ਸਲੂਸ ਵਾਲਬ 6’’ 2 No | 2025-04-24 12:00:00 | 22000 | Download |
197 | Jalandhar No. 3 | Sub Division Nakodar | Sub Divisional Engineer Water Supply & Sanitation Sub Division Nakodar | Amt of W/S Scheme Tehsil complex Nakodar & Court Complex Nakodar | 2025-04-24 03:00:00 | 196100 | Download |
198 | Kapurthala | Sub Division No.1 Kapurthala | Water Supply & Sanitation Sub Division No. 1, Kapurthala | Prov. & Fixing Sanitary Fixture at Virsa Vihar Kapurthala & Prov. & Fixing Sanitary Fixture at DAC Building Kapurthala | 2025-04-28 03:00:00 | 37030 | Download |
199 | Kapurthala | Sub Division No.2 Kapurthala | Water Supply & Sanitation Sub Division No. 2, Near Phuwara Chownk Kapurthala | Op./Mtc Water Supply Scheme Village Dhaliwal Bet Block Dhilwan | 2025-04-25 03:00:00 | 16657 | Download |
200 | Pathankot No. 2 | Sub Division No.-3 Pathankot | room no 236 dc complex | /MTc of Water Supply scheme Bhanwal
Prov. & fixing of C.I double flange sluice
valve 150mm i/d, 100mm i/d, incluiding
excavation bailing out water and all
accessories, construction of Sluice valve chamber
(0.90mx0.90m), & all other works contingent
thereto.
| 2025-04-23 16:30:00 | 35500 | Download |
201 | Ferozpur No. 1 | Sub Division Ghall Khurd | Near by BDPO Office Ghall khurd | A/mtc of Various water Supply Scheme for Section S-352
day to day Repair & maintenance activities such as Plugging of leakages, repair of sluice valve, P/F pipe line repair of pump, Motor, P/F wire etc. and all other works Contingent there to at various water supply Schemes.
| 2025-05-02 15:00:00 | 49900 | Download |
202 | Jalandhar No. 1 | Sub Division Nurmahal | Near Bus Stand Nurmahal | A/Mtc of water supply scheme Saidowal Block Nurmahal | 2025-04-23 12:00:00 | 28350 | Download |
203 | Mansa No. 1 | Sub Division Sardulgarh | Near Bus Stand Sardulgarh Water Supply & Santation Sub Division Sardulgarh | 1. A/mtc. w/s scheme Chotain Rs 30000/-
2 A/mtc. w/s scheme Jhanduke Rs 30000/-
3. A/mtc. w/s scheme Jatana Khurd Rs. 30000/- | 2025-04-25 11:00:00 | 90000 | Download |
204 | Shri Anandpur Sahib | SUB DIVISION NO.2 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No.2, Sri Anandpur Sahib. | Supply/pouring of Bleaching powder (100 bags) including loading unloading and usage at for Various W/S Schemes of Sub Division No.2 Sri Anandpur Sahib.
| 2025-04-30 15:00:00 | 50000 | Download |
205 | Ludhiana No. 1 | Sub Division Raikot | Sub Division Raikot | As per short Tender notice Enclosed | 2025-05-01 14:00:00 | 50000 | Download |
206 | Fatehgarh Sahib | Sub Division No.2 Fatehgarh Sahib | Sub Divisional Engineer Water Supply and sanitation Sub Division No.2 Fatehgarh Sahib | 1. ਕੰਪਿਊਟਰ ਉਪਰੇਟਰ ਕੰਮ ਡਾਟਾ ਐਂਟਰੀ ਓਪਰੇਟਰ ਦੀਆਂ ਸੇਵਾਵਾਂ ਮੁਹੱਈਆ ਕਰਵਾਉਣਾ।
2.ਦਫਤਰੀ ਹੈਲਪਰ ਦੀਆਂ ਸੇਵਾਵਾਂ ਮੁਹੱਈਆਂ ਕਰਵਾਉਣਾ। | 2025-04-24 12:00:00 | 50000 | Download |
207 | Fatehgarh Sahib | Sub Division No.2 Fatehgarh Sahib | Sub Divisional Engineer Water Supply and sanitation Sub Division No.2 Fatehgarh Sahib | ਲੜੀ ਨੰ. 1-12 ਲਈ) ਸਲਾਨਾਂ ਦੇਖਭਾਲ ਜਲ ਸਪਲਾਈ ਸਕੀਮਾਂ ਉੱਤੇ ਲੱਗੀ ਮਸ਼ੀਨਰੀ ਨੂੰ ਚਲਾ ਕੇ ਪਿੰਡਾਂ ਵਿੱਚ ਸਾਫ ਪਾਣੀ ਦੀ ਨਿਰਵਿਘਨ ਸਪਲਾਈ ਦੇਣਾ, ਮਸ਼ੀਨਰੀ ਦਾ ਰੱਖ-ਰੱਖਾਵ ਕਰਨਾ, ਵਾਟਰ ਵਰਕਸ ਤੇ ਲੱਗੇ ਬੂਟੇ, ਘਾਹ, ਹੈੱਜ ਆਦਿ ਨੂੰ ਸਹੀ ਹਾਲਤ ਵਿੱਚ ਰੱਖਣਾਂ ਅਤੇ ਸਕੀਮ ਨਾਲ ਸਬੰਧਿਤ ਹੋਰ ਕੰਮ ਕਰਨੇ ਮਹਿਕਮੇ ਦੀਆਂ ਸ਼ਰਤਾ ਅਨੁਸਾਰ।
(ਲੜੀ ਨੰ. 13) ਕੋਰਟ ਕੰਪਲੈਕਸ ਖਮਾਣੋਂ ਵਿਖੇ ਨਿਰਵਿਘਨ ਸਾਫ ਪਾਣੀ ਦੀ ਸਪਲਾਈ ਦੇਣਾ, ਮਸ਼ੀਨਰੀ ਦਾ ਰੱਖ-ਰੱਖਾਵ ਕਰਨਾ
ਰੇਟ ਠੇਕੇਦਾਰ ਦੁਆਰਾ ਭਰੇ ਜਾਣਗੇ ਪ੍ਰਤੀ ਮਹੀਨਾਂ ਦੇ ਹਿਸਾਬ ਨਾਲ
1)ਬੌੜ 2) ਸਿੱਧੂਪੁਰ ਕਲਾਂ 3) ਬਦੇਸ਼ ਕਲਾਂ 4) ਖੰਟ 5) ਚੜੀ 6) ਭੜੀ 7)ਫਰੌਰ 8) ਧਨੌਲਾ 9) ਰਤਨਗੜ੍ਹ 10) ਮਨੈਲਾ 11) ਜਟਾਣਾਂ ਨੀਵਾਂ 12) ਨਾਨੋਵਾਲ 13) ਕੋਰਟ ਕੰਪਲੈਕਸ ਖਮਾਣੋਂ
(ਲੜੀ ਨੰ. 1-12 ਲਈ) ਸਲਾਨਾਂ ਦੇਖਭਾਲ ਜਲ ਸਪਲਾਈ ਸਕੀਮਾਂ ਉੱਤੇ ਲੱਗੀ ਮਸ਼ੀਨਰੀ ਨੂੰ ਚਲਾ ਕੇ ਪਿੰਡਾਂ ਵਿੱਚ ਸਾਫ ਪਾਣੀ ਦੀ ਨਿਰਵਿਘਨ ਸਪਲਾਈ ਦੇਣਾ, ਮਸ਼ੀਨਰੀ ਦਾ ਰੱਖ-ਰੱਖਾਵ ਕਰਨਾ, ਵਾਟਰ ਵਰਕਸ ਤੇ ਲੱਗੇ ਬੂਟੇ, ਘਾਹ, ਹੈੱਜ ਆਦਿ ਨੂੰ ਸਹੀ ਹਾਲਤ ਵਿੱਚ ਰੱਖਣਾਂ ਅਤੇ ਸਕੀਮ ਨਾਲ ਸਬੰਧਿਤ ਹੋਰ ਕੰਮ ਕਰਨੇ ਮਹਿਕਮੇ ਦੀਆਂ ਸ਼ਰਤਾ ਅਨੁਸਾਰ।
(ਲੜੀ ਨੰ. 13) ਕੋਰਟ ਕੰਪਲੈਕਸ ਖਮਾਣੋਂ ਵਿਖੇ ਨਿਰਵਿਘਨ ਸਾਫ ਪਾਣੀ ਦੀ ਸਪਲਾਈ ਦੇਣਾ, ਮਸ਼ੀਨਰੀ ਦਾ ਰੱਖ-ਰੱਖਾਵ ਕਰਨਾ
| 2025-04-24 12:00:00 | 50000 | Download |
208 | Ludhiana No. 2 | Sub Division No.3 Ludiana | Partap Chowk, Metro Raod, Ludhiana | Amtc Water Supply Schemes Gaunsgarh, Mangat | 2025-04-25 14:00:00 | 22700 | Download |
209 | Shri Anandpur Sahib | SUB DIVISION NO.2 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No.2, Sri Anandpur Sahib. | Repair of pipe line leakage for Different Dia of pipe (PVC Pipe, MS Pipe, GI Pipe & DI pipe) at Various location of w/s/s complete in all espect i.e excavation pipe & all other works continent there too.
6” Dia PVC Pipe
4” Dia PVC Pipe
3 Dia PVC Pipe
8” GI Pipe
(A/mtc Water Supply Schemes Matour Ballowal) | 2025-04-25 15:00:00 | 50000 | Download |
210 | Shri Anandpur Sahib | SUB DIVISION NO.2 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No.2, Sri Anandpur Sahib. | Repair of pipe line leakage for Different Dia of pipe (PVC Pipe, MS Pipe, GI Pipe & DI pipe) at Various location of w/s/s complete in all espect i.e excavation pipe & all other works continent there too.
6” Dia PVC Pipe
4” Dia PVC Pipe
3 Dia PVC Pipe
8” GI Pipe
(A/mtc Water Supply Schemes Kotla) | 2025-04-25 15:00:00 | 49560 | Download |
211 | Shri Anandpur Sahib | SUB DIVISION NO.2 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No.2, Sri Anandpur Sahib. | Repair of pipe line leakage for Different Dia of pipe (PVC Pipe, MS Pipe, GI Pipe & DI pipe) at Various location of w/s/s complete in all espect i.e excavation pipe & all other works continent there too.
6” Dia PVC Pipe
4” Dia PVC Pipe
3 Dia PVC Pipe
8” GI Pipe
(A/mtc Water Supply Schemes Khamera) | 2025-04-25 15:00:00 | 50000 | Download |
212 | Shri Anandpur Sahib | SUB DIVISION NO.2 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No.2, Sri Anandpur Sahib. | Repair of pipe line leakage for Different Dia of pipe (PVC Pipe, MS Pipe, GI Pipe & DI pipe) at Various location of w/s/s complete in all espect i.e excavation pipe & all other works continent there too.
6” Dia PVC Pipe
4” Dia PVC Pipe
3 Dia PVC Pipe
8” GI Pipe (A/mtc Water Supply Schemes Mehroli)
| 2025-04-25 15:00:00 | 48500 | Download |
213 | Shri Anandpur Sahib | SUB DIVISION NO.2 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No.2, Sri Anandpur Sahib. | Repair of pipe line leakage for Different Dia of pipe (PVC Pipe, MS Pipe, GI Pipe & DI pipe) at Various location of w/s/s complete in all espect i.e excavation pipe & all other works continent there too.
6” Dia PVC Pipe
4” Dia PVC Pipe
3 Dia PVC Pipe
8” GI Pipe (W/S scheme Agampur)
| 2025-04-25 15:00:00 | 50000 | Download |
214 | Ferozpur No. 1 | Sub Division No.1, Ferozpur | Near Zira Gate Water Supply Sanitation Complex FZR | Tender Notice of 4 N0. Various Works Vide no. 630-639 dt 11-04-2025 | 2025-04-28 03:00:00 | 100000 | Download |
215 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | W/S & Sanitation Sub Division No.1, Sri Anandpur Sahib. | Resistivity Survey of Village Kahiwal and Samlah with deep penetration to know the types of sub surface strata at different depths. (A/mtc. W/S Scheme Paharpur Samlah Section 556) | 2025-04-23 15:00:00 | 45000 | Download |
216 | Mansa No. 2 | Sub Division Budhlada | water supply and sanitation sub division budhlada | a/mtc water supply scheme biroke kalan,Biroke khurd, datewas,kalipur,Bareh, gurney kalan, piplian | 2025-04-25 11:30:00 | 387300 | Download |
217 | Ludhiana No. 1 | Sub Division Raikot | Water Supply and Sanitation Sub Division Raikot | As per Short tender notice Enclosed | 2025-04-28 14:00:00 | 127400 | Download |
218 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | 12 No. APD/Helper, Bill Clerk on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 572 Amount-483732/- | 2025-04-25 15:00:00 | 483732 | Download |
219 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | 12 No. APD/Helper,Mcc, Ledger Keeper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 571 Amount-476399/- | 2025-04-25 15:00:00 | 476399 | Download |
220 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | 12 No. APD/Helper, Ledger Keeper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 570 Amount-488376/- | 2025-04-25 15:00:00 | 488376 | Download |
221 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | 12 No. APD/Helper, Helper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 569 Amount-485280/- | 2025-04-25 15:00:00 | 485280 | Download |
222 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | Revised 09 No. APD/Helper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 568 Amount-366282/ | 2025-04-25 15:00:00 | 366282 | Download |
223 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | Revised 09 No. APD/Helper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 567 Amount-363590/- | 2025-04-25 15:00:00 | 363590 | Download |
224 | Ropar | SUB DIVISION CHAMKAUR SHAIB | sub divisional engineer water supply & sanitation sub division shri chamkaur sahib | Rewinding, repair of pump,dismantling,relowering, outside pump chamber of 25 B.H.P. motor & pump at annual maintenance water supply scheme KHOKHAR section s578 khokhar | 2025-04-25 15:00:00 | 30000 | Download |
225 | Ropar | SUB DIVISION CHAMKAUR SHAIB | sub divisional engineer water supply and sanitation sub division shri chamkaur sahib | operation & maintenance of water supply scheme jassran & tehsil complex shri chamkaur sahib including repair of leakage up keep of water works and safe guard of machinery complete in all respect for the period of two month (1-4-2025 to 31-05-2025) | 2025-04-25 15:00:00 | 37026 | Download |
226 | Kapurthala | Sub Division No.2 Kapurthala | water supply and sanitation sub division no.2 kapurthala | Op/mtc of JCC at Kapurthala Filling of fire extinguisher & other works | 2025-04-25 03:00:00 | 35045 | Download |
227 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | Water Supply And Sanitation Sub Division NO.1 Sri Anandpur Sahib | Providing Service and facility to Data Entry Operator in Division Office Sri Anandpur Sahib
for the period of 01-05-2025 to 30-06-2025 (2 month) | 2025-04-23 15:00:00 | 37026 | Download |
228 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | Water Supply And Sanitation Sub Division NO.1 Sri Anandpur Sahib | Total Number of Employees 10, W/S/Scheme Paharpur Samlah | 2025-04-23 15:00:00 | 393340 | Download |
229 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | Water Supply And Sanitation Sub Division NO.1 Sri Anandpur Sahib | Total Number Of Employee 8, W/S/S Rampur Lamlehri 4 No., W/S/S Dasmesh Academy 4 No. | 2025-04-23 15:00:00 | 333840 | Download |
230 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | Water Supply And Sanitation Sub Division NO.1 Sri Anandpur Sahib | Total Number Of Employee 8 No. Water Supply Scheme Sri Anandpur Sahib | 2025-04-23 15:00:00 | 316424 | Download |
231 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | Water Supply And Sanitation Sub Division NO.1 Sri Anandpur Sahib | Total Number Of Employee 8 No. Water Supply Scheme APS | 2025-04-23 15:00:00 | 321888 | Download |
232 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | Water Supply And Sanitation Sub Division NO.1 Sri Anandpur Sahib | Total Number Of Employee 6 No. Sewerage Scheme APS | 2025-04-23 15:00:00 | 250380 | Download |
233 | Shri Anandpur Sahib | SUB DIVISION NO.1 SHRI ANANDPUR SAHIB | Water Supply & Sanitation Sub Divn. No1 Sri Anandpur Sahib | Total Number Of Employee 8 no. at Sewerage Scheme APS | 2025-04-23 15:00:00 | 315264 | Download |
234 | Shri Anandpur Sahib | SUB DIVISION NO.2 SHRI ANANDPUR SAHIB | Water Supply And Sanitation Sub Division no. 2 Sri Anandpur Sahib. | Total Number Of Employee 12. W/S/S Kiratpur/Kalyanpur 7 no., W/S/S Gara Moura 2 No., W/S/S Chikna 3 No. | 2025-04-23 15:00:00 | 474460 | Download |
235 | Shri Anandpur Sahib | SUB DIVISION NO.2 SHRI ANANDPUR SAHIB | Water Supply and Sanitation Sub Division No. 2 Sri Anandpur Sahib | Total number of Employee 12 no. W/S/S Kiratpur/Kalyanpur 5 no., W/S/S Gara Mora 2 No., W/S/S Chikna 3 No. | 2025-04-23 15:00:00 | 474460 | Download |
236 | Shri Anandpur Sahib | SUB DIVISION NO.2 SHRI ANANDPUR SAHIB | Water Supply And Sanitation Sub Division No.2 Sri Anandpur Sahib . | Total 11 no. Employees W/S/S Agampur 3 no., W/S/S Mator Balowal 2 no,W/S/S Kotla 2 no., W/S/S Mehroli 2 no., W/S/S Khamera 2 no. | 2025-04-23 15:00:00 | 434424 | Download |
237 | Ferozpur No. 1 | Sub Division No.1, Ferozpur | Near Zira Gate W/S & Sanitation Complex | Tender Notice of 2 No. Various work 600-609 dt 09-04-2025 | 2025-04-23 15:00:00 | 50000 | Download |
238 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | 08 No. APD/Helper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 568 Amount-324552/- | 2025-04-23 15:00:00 | 324552 | Download |
239 | Shri Anandpur Sahib | SUB DIVISION NURPUR BEDI | Sub Divisional Engineer,Water Supply & Sanitation S/Divn,Nurpur Bedi | 08 No. APD/Helper on Contract basis for Op. & maintenance of W/Supply Scheme for the period of 01-05-2025 to 30-06-2025 (2 Month)Section 567 Amount-327648/- | 2025-04-23 15:00:00 | 327648 | Download |
240 | Bathinda No. 3 | Subdivision No 2 Bathinda | Sub Division No. 2 Bathinda | Name of Scheme:- A/Mtc Urban Estate phase 1,2 and 3 including 25 GAJ EWS Bathinda
Supply of material for repair of leakages in distribution system &all other work contingent there too.
Name of Scheme:- A/Mtc Head water works Bathinda
Repair of various sluice valves at HWW Bathinda & all other work contingent there too.
Name of Scheme:- A/Mtc Head water works Bathinda
P/F carpet in executive engineer room in div office & all other work contingent there too.
Name of Scheme:- A/Mtc Govt polytechnic college Bathinda(Deposit work)
Minor repair in washrooms of Govt polytechnic college Bathinda & all other work contingent there too.
Name of Scheme:- A/Mtc Govt polytechnic college Bathinda(Deposit work)
Cleaning of sewer line with tractor operated suction machine & all other work contingent there too.
| 2025-04-25 11:00:00 | 156000 | Download |
241 | Talwara | SUB DIVISION NO. 1 TALWARA | Xen W/S & Sanitation Division talwara | 1) Op.w/s scheme Jugial Sunehra,Dohar Bhera,Jugial Gaggar, Beh Fatto, Fatehpur, Beh Lakhan , Beh Ranga,Haler, Dhar Bankaranpur,Depur, ,Changarwan,Rakari , Sathwan, Heer Beh, Beh Jogan, Beh Dullo.
i) Supply of Sodium Hyprochlorite Solution
1100 Ltr @Rs. 40000/-
| 2025-09-04 15:00:00 | 40000 | Download |
242 | Ropar | SUB DIVISION NO 2 ROPAR | Sub Division No 2 ropar | Description of work
Water Supply Scheme Ghanauli Sub Division no 2 Block & Distt Ropar. Qty. Rates. Approx.Cost.
Supply of labour for Maintenance of water supply scheme including repairs of water works & safe guard of machinery complete in all respect for all days of month 01-04-2025 to 30-06-2025 (3Month) As per site Rate to be Quoted by Contt. 34500/-
| 2025-04-28 15:59:00 | 34500 | Download |
243 | Talwara | SUB DIVISION NO. 2 TALWARA | ਕਾਰਜਕਾਰੀ ਇੰਜੀਨੀਅਰ,
ਜਲ ਸਪਲਾਈ ਅਤੇ ਸੈਨੀਟੇਸ਼ਨ ਮੰਡਲ,
ਤਲਵਾੜਾ
| 1 Name of Work:- Prov. Ws scheme nangal khanoura chargeable to deposit works
Sr. No. Description of work Qty. Rate
1 Dismantling of (PPGL) precoated painted galvalume sheet roofing, angles,tees,and bars and fixing at new sub division offic3 including cost of cutting,welding, nut bolts,screws, welder complete in all respects.. As per Site
@Rs.35000/-
2 Hiring of tractor with trolley for transporting office material including cost of skilled labour. And all other works related too.
Note:-The details of work can be seen in the office of the undersigned on any working day.
| 2025-07-03 15:00:00 | 35000 | Download |
244 | Kapurthala | Sub Division Bhulath at Kapurthala | At water supply scheme Village Dhaliwal Dona Distt Kapurthala | Op/Mtc water Supply Scheme at Hassuwal Chaugwan,Block Nadala,Distt Kpt 15.00 BHP Rewinding of Motor | 2025-09-07 03:00:00 | 16800 | Download |
245 | Mukatsar No 2 | Subdivision No 6 Mukatsar | Main Water Works Complex KKP Road Sri Muktsar SAhib | 1) Repair of 54 BHP Motor
2) Providing 1 No Driver & 1 No Pump Operator | 2025-11-03 15:00:00 | 65000 | Download |
246 | Mukatsar No 2 | Subdivision No 6 Mukatsar | Main Water Works Complex KKP Road Sri Muktsar SAhib | 1)Providing & Laying HDPE Water Supply Pipe Line for Malwa Hospital on Labour Rate
2) Providing & Laying Pipe Line For Making Sewer Connection for Malwa Hospital & Raising of Manhole at Labour Rate | 2025-12-03 15:00:00 | 50000 | Download |
247 | SBS Nagar | Sub Division No.2 Balachaur | office of Sub Div Engineer W/S & Sanitation Sub Div-2 balachaur at Water Works Garhi Kanugoan | A/mtc of W/S Scheme Bhedian
To run the pumping machinery,watch& ward upkeep of water work (All Works related to W/S SCheme Bhedian) For the period of 01.03.2025 to 31.05.2025 | 2025-05-03 11:00:00 | 50000 | Download |
248 | Ludhiana No. 3 | Sub Division Sidhwan Bet | water supply and sanitation, division no. 3, sub division sidhwanbet at ludhiana |
1.
A/mtc W/S Schemes Hambran, Bhundri, Sangatpura and Sadarpura
Providing and Fixing pvc roof panel in Sub division office including cost of Transportation, Labour, Fitting etc.
20000/-
12-3-2025
3.00 PM
| 2025-12-03 15:00:00 | 20000 | Download |
249 | Bathinda No. 2 | Sub Division Rampura | EXECUTIVE ENGINEER WATER SUPPLY AND SANITATION DIVISION NO.2 BATHINDA | CONSTRUCTION OF TRANSGENDER TOILET BLOCK AT COURT COMPLEX AT RAMPURA PHUL DISTRICT BATHINDA (PUNJAB) (PUBLIC HEALTH SERVICES AND CIVIL WORK) | 2025-12-03 13:30:00 | 348461 | Download |
250 | Rajpura | Sub Division Bahadurgarh | Water Supply & Sanitation Sub Division, Bahadurgarh | ਸੈਕਸ਼ਨ S-536, ਉਪ ਮੰਡਲ ਦਫਤਰ ਬਹਾਦਰਗੜ੍ਹ ਅਧੀਨ ਆਉਂਦੀਆਂ ਜਲ ਸਪਲਾਈ ਸਕੀਮਾਂ ਵਿਖੇ ਲੀਕੇਜ ਦੀ ਰਿਪੇਅਰ ਆਦਿ ਕੰਮ ਕਰਵਾਉਣ ਸਬੰਧੀ। | 2025-07-02 12:00:00 | 50000 | Download |
251 | Rajpura | Sub Division Bahadurgarh | Water Supply & Sanitation Sub Division, Bahadurgarh | Providing & Fixing of GI Column Pipe 3” (Class-B) make Jindal complete in all respect &
Providing & Fixing of Submersible Cable 10mm2 make Finolex/L&T at water supply schemes Kasba Rurki T/w no.2 & Ghungran, block sanour under water Supply & Sanitation Sub Division Bahadurgarh.
| 2025-05-02 14:00:00 | 45000 | Download |
252 | Ludhiana No. 3 | Sub Division No. 5 | Water Supply & Sanitation Sub Division No.5, Near Judicial Court Complex Ludhiana. | Construction of brick masonry inspection
Chambers Size 450mm x 600mm
Providing and fixing in position Manhole fixed in cement size 450mm x 450mm
P/F PVC Pipe 6'
Disilting of manhole up to 3mtr
P/F Brass ball cock with brass rod 25mm
P/F CP Brass bib cock
P/F CP Brass angle valve
Other wor contizent there to
| 3025-02-03 15:00:00 | 40000 | Download |
253 | Bathinda No. 1 | Sub Division No.1 Bathinda | Room No 432 mini sactriate water supply & sanitation Division No.1 Bathinda | Special Repair of Pressure Sand Filter of 20 CUM at W/S/S Gehri Bhagi Under 15th FC funds
1. Providing 8mm Mild Steel Plate for fixing inside PSF having internal diameter of 1.4 meter to support Filter Media including supporting Material like Channel Section/Angle Section for fixing of plate with already existing PSF drum structure.
2. Labour for making holes of 15mm Dia. on 8mm MS Plate by drilling operation
3. Labour for fixing 8mm Mild Steel Plate and Supporting Material (Channel Section/Angel Section) inside the 1 no. drum structure including taking out filter media, disassembling &assembling of fixtures of PSF Plant Parts etc. complete in all respect. | 2025-06-02 11:00:00 | 49000 | Download |
254 | Fatehgarh Sahib | Sub Division No.2 Fatehgarh Sahib | WATER SUPPLY & SANITATION SUBDIVISION NO. 2 FATEHGARH SAHIB | Repair of leakages in 3",4",6",8" AC/PVC including cost of Excavation, bailing out water, jointing and cutting of pipe and including cost of material i.e. D joint, PVC pipe, pvc socket, sluice valve complete in all other to in all respects. | 2025-09-01 12:00:00 | 30000 | Download |
255 | Fatehgarh Sahib | Sub Division No.2 Fatehgarh Sahib | WATER SUPPLY & SANITATION SUB DIVISION nO2 FATEHGARH SAHIB | Providing and fixing water heater capacity 25 ltr
Providing and fixing chinaware white sinks
Providing and fixing brass bib cock
P/f Brass float Valve (25mm)
Providing and fixing soap dish
Providing and fixing towel rail
Plastic hygienic seat cover
P/f pillar cock 15mm i/d
P/f PVC waste pipe 32mm
P/f cp brass extention piece
P/f cp brass angle valve
P/f Pvc Flexible tube
P/f SS grafting with frame
P/f waste coupling 32mm
Cleaning silt from manhole
| 2025-09-01 12:00:00 | 50000 | Download |
256 | Fatehgarh Sahib | Sub Division No.2 Fatehgarh Sahib | WATER SUPPLY & SANITATION SUB DIVISION NO. FATEHGARH SAHIB | Repair of leakages in 3",4",6",8" AC/PVC including cost of Excavation, bailing out water, jointing and cutting of pipe and including cost of material i.e. D joint, PVC pipe, pvc socket, sluice valve complete in all other to in all respects. | 2025-08-01 12:00:00 | 50000 | Download |
257 | Fatehgarh Sahib | Sub Division No.2 Fatehgarh Sahib | Water supply & sanitation sub division NO.2 Fatehgarh Sahib | 1) ਰੰਗ-ਰੋਗਨ/ਪੇਂਟ ਦਾ ਕੰਮ
2) ਲੱਕੜ ਦੇ ਕੰਮ/ਰਿਪੇਅਰ
3) ਬਿਜਲੀ ਦੇ ਕੰਮ/ਰਿਪੇਅਰ
4) ਟਾਕੀਆਂ ਦੇ ਨਿਊ ਸ਼ੀਸ਼ੇ ਦਾ ਕੰਮ ਰਿਪੇਅਰ ਸਬੰਧੀ ਅਤੇ ਹੋਰ ਸਬੰਧਿਤ ਕੰਮ ਮੌਕੇ ਅਨੁਸਾਰ।
| 2025-07-01 12:00:00 | 50000 | Download |
258 | Malerkotla | Sub Division Dhuri | water supply & Sanitation Sub Divn Dhuri. | Preparing Digital Survey of whole village with total station , prov. coloured prints of maps & Epanet of same along with house hold lists | 2025-09-27 15:00:00 | 50000 | Download |
259 | Hoshiarpur No. 2 | SUB DIVISION TANDA | SDE TANDA | REPAIR OF MOTOR PUMP SET COMPLETE IN ALL RESPECT AT SCHEME KHUN KHUN KALAN | 2027-07-05 10:40:00 | 28000 | Download |
260 | Kapurthala | Sub Division Bhulath at Kapurthala | At Water Works Village Dhaliwal Dona Distt Kapurthala | Op/Mtc water Supply Scheme Akbarpur Block Nadala Disst Kapurthala 7.50 BHP Rewinding of Motor | 2025-07-02 03:00:00 | 15500 | Download |
261 | Faridkot | Subdivision No 1 Faridkot | Sub Divisional Engineer, W/S & Sanitation Sub Division No.1 Faridkot. | A/mtc Various Water Supply Schemes under Sub Division No.1 Faridkot. | 2026-06-26 15:00:00 | 38000 | Download |
262 | Division Mechanical Patiala | sub division mechanical patiala | Sub Division Mechanical Patiala | Various works at Department of Water Supply and Sanitation, Head office Patiala and Division Mechanical as per attached scanned copy | 2424-05-20 15:00:00 | 48500 | Download |
263 | Hoshiarpur No. 1 | Sub Division No.1 HOSHIARPUR | Sub Division No 1 jalandhar Road hoshiarpur | As per uploaded Quotation notice loaded | 2025-05-22 15:00:00 | 50000 | Download |